说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 卸荷式皮带轮
1)  Unloading belt pulley
卸荷式皮带轮
2)  unloading zone
卸荷带
1.
Focused on the characteristics and numerical simulation of slope unloading zone in the Shuibuya hy-dropower project dam site area,the engineering geological exploration and rock mechanics experiment for thedam site of Shuibuya project are carried out.
围绕水布垭工程坝区岸坡卸荷带类型划分及其成因数值仿真,开展了工程地质调查、岩石力学室内外测试和试验、数值模拟分析和工程应用的研究。
3)  unloaded zone
卸荷带
1.
The in-situ stress has been released as river valley unloaded and unloaded zone ha.
实测最大水平主应力方向为NW40°~60°,最大水平主应力值最高近40MPa,最小水平主应力值为20MPa;在河床谷底浅部80m以上,受河谷卸荷影响地应力有所释放,形成卸荷带;孔深90~130m产生应力集中,形成V型峡谷典型的“应力包”分布特征;在山体内PD27#平硐不同硐深处的3个测点进行三维地应力测量。
2.
Th reasons to devide strong unloaded zone and the light one are put forward based on the project practice.
对自然边坡卸荷带变形特点和影响边坡自然卸荷变形因素进行了综述,并结合工程经验提出了强卸荷带 与弱卸荷带的划分依据,对自然边坡卸荷带的基本特征进行了探讨。
4)  deep unloaded band
深卸荷带
1.
Formation cause analysis of deep unloaded band of rock mass in left dam shoulder of Jinping hydropower station;
锦屏水电站左坝肩岩体深卸荷带成因分析
5)  classification of unloading zone
卸荷分带
1.
Study on the classification of unloading zones of Emeishan basalt hydroelectric project sites in southwestern China
西南水电工程坝址峨眉山玄武岩卸荷分带研究
6)  unloading disturbed area
卸荷影响带
1.
The unloading disturbed area of in the rock mass of permanent ship passage in Three Gorges of the YangtzeRiver and the relaxed bound around the headrace tunnel of Shuibuya Dam on the Qingjiang River are two typical engi-neering problems to geophysical exploration.
长江三峡工程永久船闸高边坡卸荷影响带和清江水布垭导流洞洞壁松动圈对物探检测来说是两个极具代表性的工程问题,而地震波 CT 和声波测试又分别代表着最前沿和最常规的物探检测方法。
补充资料:混合式卸料斗式提升机
分子式:
CAS号:

性质:斗式提升机的一种。其结构与离心式卸料的斗式提升机结构相似。物料的装料方式与离心式卸料的斗式提升机相同。物料按离心式和重力式同时作用进行卸料,在卸料处安装一个导向链轮,使链条向内收缩,这样可使料斗内倾,重力可将料斗内的物料完全卸空。混合式卸料的斗式提升机主要用于输送含有空气的细粉粒或有黏性的物料,它的输送速度要比离心式卸料的斗式提升机要慢。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条