1) regulation beforehand
事前规制
1.
Under the impact of financial crisis,Japanese financial regulation changed from "regulation beforehand" which restricted competition to "regulation afterward" which focused on improving operation,and at present it is evolving to sheltered regulation system which combines "regulation beforehand" and "regulation afterward" in order to keep away systematic risks.
日本金融业规制在金融危机的影响下,从限制竞争的"事前规制"演进到注重健全经营的"事后规制",目前正向"事前规制"与"事后规制"相结合的以防范系统性风险为目的的保护性规制体系演进。
2) regulation in advance
事前规范
1.
From the three aspects -regulation in advance, supervision inwards and trace afterwards, this paper analyzes how to improve the marketing occupancy and competitive power of enterprises, decrease the cost of du.
本文从应收账款的事前规范、事中监控、事后跟踪等三个方面阐述了提高企业市场占有率和市场竞争能力,降低应收账款的持有成本,保持最佳应收账款规模的管理方法。
3) control in advance
事前控制
1.
Engineering quality control is important content in constructing management, the paper discusses three phrases in controlling engineering quality: control in advance, control in the event, and control after the event.
主要论述了工程质量事前控制、事中控制和事后控制的3个阶段。
2.
This paper makes a brief introduction to the general situation and the major measures for schedule control in Shenzhen Metro Phase 1, emphasizing through practical cases the roles played by the control in advance and integrated coordination in schedule control.
简要叙述深圳地铁一期工程概况,介绍工程进度控制的主要措施;通过工程实例,说明事前控制和综合协调在进度控制中的作用;阐述进度控制的体会,分析存在的经验和教训。
4) pre-control
事前控制
1.
How to do well the pre-control of engineering quality of supervision engineer;
监理工程师应如何做好工程质量的事前控制
2.
On how to make a pre-control of installation project supervision of high building;
浅谈如何搞好高层建筑安装工程监理的事前控制
5) prior control
事前控制
1.
,basing on the principle of prior control before accident,Construction Quality Management was discussed in the construction quality control of this type of engineering.
以利莱森玛(福州)制造基地主车间及综合楼PHC管桩施工为例,在施工质量控制工作中,以事前控制为指导思想,施工前认真研究工程地质、场地及环境等条件,分析PHC管桩静压施工时可能存在或出现的问题,包括压桩机沉陷问题、配桩问题、桩位偏移问题、压桩顺序及桩的上浮问题,提出有针对性的施工技术和质量管理措施,使各重要施工技术环节都得到周密完善的事前控制,从而取得相当满意的工程实施效果。
2.
Aiming at the common fault about the quality in the built-in construction in the construction work,it introduces the quality control measures from two aspects of prior control and process control,and represents the method of creating target responsibility system aiming at the quality management in order to ensure the built-in construction in the construction work.
针对建筑安装工程中预埋施工存在的质量通病,从事前控制、过程控制两方面介绍了其质量控制措施,针对质量管理,阐述了质量目标责任制的建立方法,以保证建筑安装工程预埋施工质量。
补充资料:事前
1.事情发生或处理﹑了结以前。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条