Engineering quality control is important content in constructing management, the paper discusses three phrases in controlling engineering quality: control in advance, control in the event, and control after the event.
主要论述了工程质量事前控制、事中控制和事后控制的3个阶段。
2.
This paper makes a brief introduction to the general situation and the major measures for schedule control in Shenzhen Metro Phase 1, emphasizing through practical cases the roles played by the control in advance and integrated coordination in schedule control.
简要叙述深圳地铁一期工程概况,介绍工程进度控制的主要措施;通过工程实例,说明事前控制和综合协调在进度控制中的作用;阐述进度控制的体会,分析存在的经验和教训。
3)  pre-control
事前控制
1.
How to do well the pre-control of engineering quality of supervision engineer;
监理工程师应如何做好工程质量的事前控制
2.
On how to make a pre-control of installation project supervision of high building;
浅谈如何搞好高层建筑安装工程监理的事前控制
4)  prior control
事前控制
1.
,basing on the principle of prior control before accident,Construction Quality Management was discussed in the construction quality control of this type of engineering.
以利莱森玛(福州)制造基地主车间及综合楼PHC管桩施工为例,在施工质量控制工作中,以事前控制为指导思想,施工前认真研究工程地质、场地及环境等条件,分析PHC管桩静压施工时可能存在或出现的问题,包括压桩机沉陷问题、配桩问题、桩位偏移问题、压桩顺序及桩的上浮问题,提出有针对性的施工技术和质量管理措施,使各重要施工技术环节都得到周密完善的事前控制,从而取得相当满意的工程实施效果。
2.
Aiming at the common fault about the quality in the built-in construction in the construction work,it introduces the quality control measures from two aspects of prior control and process control,and represents the method of creating target responsibility system aiming at the quality management in order to ensure the built-in construction in the construction work.
针对建筑安装工程中预埋施工存在的质量通病,从事前控制、过程控制两方面介绍了其质量控制措施,针对质量管理,阐述了质量目标责任制的建立方法,以保证建筑安装工程预埋施工质量。
5)  control beforehand
事前控制
6)  beforehand control
事前控制
1.
beforehand control, intermediate control and afterwards control.
为此,结合实践经验,从事前控制、事中控制、事后控制3个方面论述了水利工程施工中使用商品混凝土的质量控制措施及方法,确保工程质量。
2.
The significance carrying out construction cost control is introduced and from beforehand control, daily control and related feed back system basic cost control methods are elaborated as well as corresponding points for attention in cost control.
介绍了工程成本控制的具体意义 ,并从事前控制、日常控制和日常工程成本控制的考核方法等方面阐述了工程成本控制的基本方法 ,指出在进行工程成本控制的同时应注意的基本原则。
补充资料:四连杆装箱包装机中可编程控制器的应用(中)
3、5 为了使PLC系统安全可靠运行,采取了多种防护措施,如和系统中的强电设备分开接地,接地线的截面积大于2平方毫米。PLC输入和输出的感性负载都并联续流二极管等,以消除输入触点在断开时,感性负载因储能作用而产生电弧高于电源电压数倍甚至于数十倍的反电势对系统产生的干扰。见图(3)。
 

  3、6 系统的输入部分36点,输出19点,一共占用PLC 54点,系统冗余6点,符合自动化系统设计要求。
  

  4、程序设计

      PLC程序采用梯形图编写,其自动控制操作流程图见图(4)。其中,PLC主程序参照原有继电器控制系统的电气控制原理图进行设计,这种程序设计方法简单,有现成的电气控制线路为依据,设计周期短,在旧设备电气系统改造中经常采用。
 

      按照原有电气控制系统输入信号及输出信号做为PLC的I/O点,原来由继电器硬件完成的逻辑控制功能由PLC软件——梯形图替代完成。图(5)为四连杆装箱包装机进箱臂部分电气控制原理图。图(6)为转换后的四连杆装箱包装机进箱臂部分PLC程序梯形图。进箱臂部分主要I/O对照表如下
 

 

 
文章编辑:moji
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条