1) excavation quantity
采剥量计算
2) calculated annual overall output of ore and waste
计算年采剥总量
3) construction capacity calculation
采剥工程量计算
1.
Research on construction capacity calculation and visualization of open pit mine;
露天矿采剥工程量计算与可视化新方法研究
4) calculation of denudation amount
剥蚀量计算
1.
A calculation of denudation amount on Palaeogene-Neogene unconformity in Shengtuo area of Dongying sag using Milankovitch cycle method;
东营凹陷古近系与新近系之间存在一区域不整合面,该不整合面抬升剥蚀过程的恢复和剥蚀量计算,对恢复区内埋藏史、热史以及生烃史有重要意义。
5) stripping plan
采剥计划
1.
After researching the mathematical algorithm of drawing edition in the stripping plan CAD, a new algorithm of how to offset a polyline between two points and how to calculate the given volume of rock and coal is put forward .
本文还对采剥计划CAD中所涉及的图形编辑的数学方法进行了理论研究,提出了一种新的两点间多段线平移算法和利用分段线性插值方法来搜索计算计划矿岩量的数学方法,在此基础上,以伊敏河一露天矿为例,以AutoCAD为平台,以Visual Basic 6。
6) General Volume of Mining and Stripping
采剥总量