1) short-term stripping plan
短期采剥计划
1.
Development of surface mine short-term stripping plan CAD system;
露天矿短期采剥计划CAD系统的开发
2) stripping plan
采剥计划
1.
After researching the mathematical algorithm of drawing edition in the stripping plan CAD, a new algorithm of how to offset a polyline between two points and how to calculate the given volume of rock and coal is put forward .
本文还对采剥计划CAD中所涉及的图形编辑的数学方法进行了理论研究,提出了一种新的两点间多段线平移算法和利用分段线性插值方法来搜索计算计划矿岩量的数学方法,在此基础上,以伊敏河一露天矿为例,以AutoCAD为平台,以Visual Basic 6。
4) mining and peeling plan
采剥进度计划
1.
Factors influence the realization ratio of open-pit mine mining and peeling plan were analyzed.
针对金堆城钼矿采剥进度计划编制现状,结合多年来采矿技术管理经验,从矿石品位入手,分析了影响采剥计划实现率的因素,通过准确探测及推算矿量和矿石品位,提高采剥计划编制的准确性,加强采矿生产管理等途径,以达到提高采剥计划实现率的目的。
2.
Rational forecasting the grade of a raw ore is the basis of mining and peeling plan in the mine, application of grey system for the grade of a raw ore that acquire good application value in Jinduicheng open-pit mine.
合理地预测原矿品位是矿山的采剥进度计划编制的基础,将灰色系统应用于金堆城露天矿的原矿品位预测,取得了较好的实用价值。
5) planning of stripping and mining schedule
剥采进度计划
6) optimization of working plan
剥采计划优化
补充资料:短期计划
duanqi jihua
短期计划
short-term plan
对较短时期内的经济、社会活动进行有目标的事先协调与控制的形式。通常是指为期一年的年度计划。以一年为计划时限,与农业生产周期和国家财政预算期是一致的,也符合人们按日历年度组织管理经济、社会活动的习惯。
在社会主义国家,短期计划具体贯彻实现中期计划的各项要求,是中期计划与现行活动之间的纽带。在中期计划分列年度指标的情况下,年度计划的制订则比较简单易行。但是,制订中期计划时,总有一些难以预见的因素,如农业生产的丰歉及对使用农业原料部门的影响,国外市场的波动,重大建设项目投产时间提前或推后,等等。因此,必然要求通过年度计划,根据当年以及未来一、二年的情况作出全面分析和预测,对社会需要和社会资源进行详细的核算平衡,并在上下年度之间,地区、部门、企业之间,以及与全国计划之间协调、衔接。这样,可以尽量减少或避免对中期计划原订分年指标进行频繁的调整,以加强计划的稳定性和严肃性。
社会主义国家年度计划规定的计划任务和有关技术经济指标、内容,比中期计划更为具体、细致、准确,特别是要明确规定工农业主要产品和产量,固定资产投资额,在建工程项目投入使用的具体期限,劳动生产率,工资基金和主要经济效益指标。安排计划时,重点在于当年消费品供应与社会购买力的平衡,生产资料的供求平衡,财政、信贷、物资、外汇的平衡和劳动力平衡。此外,对国家采取的经济政策、技术措施和计划管理形式、方法的调整,也要作出相应的规定。
季度、月度计划或更短时限的计划,也属于短期计划,主要在部门、公司和基层企业编制。
(吴微)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条