Because the prediction accuracy of ANN and Fuzzy system algorithm is insufficient for underground powerhouse rock surrounding stability,the method of Accurate Online Support Vector Regression(AOSVR)was ap- plied to study the evolution law for underground powerhouse rock surrounding displacement.
针对目前广泛使用的模糊系统和神经网络预测方法在地下结构围岩变形预测中的缺陷,提出一种精确在线支持向量机(AOSVR)并将其应用到水电站地下厂房开挖过程中项拱围岩的变形预测。
2.
The substructure of the powerhouse, especially the underground powerhouse of the large-scaled station, in the natural environment, is subjected to the continuously changing air temperature, solar radiation and water temperature.
本文结合构皮滩水电站地下厂房下部结构,运用大型有限元分析软件ANSYS,首先研究了垫层的弹性模量和包角对蜗壳外围混凝土受力状态和变形的影响;接着,引入Willam-Warnke五参数破坏准则,对厂房下部结构三个典型剖面进行平面非线性分析;此外,还计算了厂房下部结构在最大温降、最大温升和多年平均温度时的温度场以及温度应力,在此基础上确定温度变化对结构配筋的影响。
3.
As an important constituent part of the power station, the powerhouse, especially the underground powerhouse of the large-scaled station, induces serious vibration problem, which brings various impairs, even causes danger of the whole st.
水电站厂房,特别是大型水电站地下厂房,作为水电站的重要组成部分,它的振动会带来种种危害,甚至危及整个水电站的安全,这就使得水电站厂房的振动问题受到了普遍重视。
3)  Xiabandi power station
下坂地水电站
4)  underground hydropower station
地下电站
1.
Analysis on influence of flow velocity-flow regime and sedimentation on operation of underground hydropower station of Three Gorges Project;
三峡工程地下电站前流速流态和泥沙淤积对电站运行的影响分析
2.
Its underground hydropower station is located in the layered rocks in soft and hard rocks check.
水布垭工程地处灰岩狭谷河段,大坝高233 m,为目前世界上最高的面板堆石坝;地下电站位于软硬相间的层状岩体中;溢洪道最大泄洪功率3。
3.
The main powerhouse of Three Gorges underground hydropower station is with large span and thin cover, and it is rare internationally.
三峡地下电站主厂房跨度大、覆盖薄,国内外少有。
5)  underground power station
地下电站
1.
Key concrete construction technology of TGP s underground power station on left bank;
三峡左岸地下电站混凝土施工关键技术
2.
Analysis on tailrace system with varying crown elevation of TGP s right bank underground power station;
三峡右岸地下电站变顶高尾水系统分析研究
3.
7 auxiliary transformer of Jingpohu Hydropower Plant underground power station in cave entrance is act as important power supply of network controlled switching station.
镜泊湖发电厂地下电站洞口#7厂用变压器作为网控开关站的重要电源,其接线方式的合理性和科学性至关重要,关系到镜泊湖地下电站的安全稳定运行。
6)  underground power plant
地下电站
1.
Hydrodynamic characteristics of changing top-altitude tailrace tunnel for Three Gorges Project s underground power plant;
三峡地下电站变顶高尾水洞水动力特性
2.
Before the excavation of diversion tunnel of the right-bank underground power plant of the Three Gorges Project,the reservoir has started its initial impoundment.
三峡右岸地下电站引水隧洞开挖前,水库已进行初期蓄水,预建段积水排放是进行引水隧洞上平段开挖贯通的前提,保证积水引排经济合理,对工程施工具有极其重要的意义。
补充资料:地下水电站
      厂房设置在地下的水电站。它一般是由立体交叉的硐室群组成。其主要优点是厂房不占地面位置,与地面水工建筑物施工干扰较少,工期较短。采用这种厂房形式的首要条件是地质上能满足硐室对稳定性的要求,厂房位置要避开地质上大断裂;对地应力大的地方要考虑厂房硐室处于最有利的地应力方向,并比较各种硐室的断面形式(一般为城门洞形、椭圆形等),改善硐室的周边应力条件。硐室的跨度大小反映出开挖技术上的难度。中国鲁布革水电站地下式厂房采用水轮机平面扭转一角度的布置方式,使硐室跨度大为减小;同时对硐室采用喷锚技术,并用岩石力学和弹塑性理论、有限元法、模型试验方法等进行设计,从而降低了工程造价。
  
  地下式水电站从枢纽布置来看,可分成两类。一类是地下式厂房位于首部枢纽。有些地下式厂房为了缩短高压引水管道,根据地质和防污条件的许可,把厂房向岸边靠近。另一类是地下式厂房位置远离首部枢纽,设在下游尾水出口的部位。这种布置大都属于长洞引水式水电站。地下式水电站特别适宜于在山区狭谷河流修建。中国早在50年代末已建成流溪河、古田一级电站等地下式水电站,60年代建成刘家峡、龚咀、白山等大型地下式水电站。其中白山水电站主厂房的硐室规模颇为庞大,其开挖尺寸为长121.5米,宽25米,高54米。
  