您的位置:首页 -> 词典 -> 防雷检测验收
1)  lightning installation inspection
防雷检测验收
2)  lightening protection detection
防雷检测
1.
The technical requirements and basic program of lightening protection detection in automobile fuelling station were introduced,and detection of preventing direct lightning strike and invasion of thunder wave were illustrated in details.
针对GB/T21431—2008《建筑物防雷装置检测技术规范》中有关加油站检测的一些技术内容不够全面、检测程序不够统一的情况,归纳整理了加油站防雷检测的基本要求、基本程序、检测内容及技术要求,并对防直击雷、防雷电波侵入和防雷电感应的检测做了较为详细的说明,供参考。
3)  acceptance test
验收检测
1.
Study of the acceptance tests for the modern medical equipment;
大型医疗设备验收检测机制的研究
2.
5, the several clauses for these standards, such as terms and definitions, requirements for metrological characteristic, acceptance tests and reverification tests and applications and so on, are discussed.
5(送审稿)的基础上,对具有接触探测系统CMM验收检测和复检检测标准中的术语和定义、计量特性要求、验收检测和复检检测、应用等若干问题进行了探讨,并提出了具体修改建议。
4)  Lightning protection examination technology
防雷检测技术
5)  LV lightning protection inspection
低压防雷检测
6)  torpedo acceptance
鱼雷验收
1.
The necessity and urgency of improvement in inspection of current torpedo are discussed through analysis of advantage and disadvantage of the current item-by-item inspection for torpedo acceptance.
分析了采用逐条验收方法进行鱼雷验收的利与弊,提出了改进现行鱼雷验收方法的必要性和紧迫性,以及采用抽样检验的鱼雷必须满足的几个条件。
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条