1) Underwater high rock slope checking and accepting
水下边坡检测验收
2) slope test
边坡检测
3) underwater slope
水下边坡
1.
In view of the insufficiency of conventional method in dealing with the underwater slope,this article proposes an integrated technique with root pile and bag-form concrete for the first time.
针对水下边坡常规治理方法的不足,首次提出树根桩和土工膜袋混凝土联合治理技术。
4) acceptance test
验收检测
1.
Study of the acceptance tests for the modern medical equipment;
大型医疗设备验收检测机制的研究
2.
5, the several clauses for these standards, such as terms and definitions, requirements for metrological characteristic, acceptance tests and reverification tests and applications and so on, are discussed.
5(送审稿)的基础上,对具有接触探测系统CMM验收检测和复检检测标准中的术语和定义、计量特性要求、验收检测和复检检测、应用等若干问题进行了探讨,并提出了具体修改建议。
5) in-water survey
水下检验
6) underwater inspection
水下检测
1.
Defects image database system for underwater inspections;
面向水下检测的缺陷图像数据库系统
2.
The development of underwater inspection & underwater maintenance technology are introduced.
介绍了国外海洋工程水下检测和维修技术的发展状况、国内开展水下检测和维修技术研究及实际应用情况。
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条