1) prestress hanging basket
预应力挂篮
2) prethrowing height of suspension basket
挂篮预抛高
4) hanging basket
挂篮
1.
Design and construction of hanging basket in Weishenghe Bridge engineering;
卫生河大桥挂篮设计与施工
2.
Pre-compression experiment of hanging basket in Liangji canal bridge;
梁济运河大桥挂篮预压试验
3.
Discussion on design and application of hanging basket of Ganglidao Bridge;
港里岛大桥挂篮设计及应用探讨
5) form traveler
挂篮
1.
The article introduces the design scheme of chevron composite triangular stabilized struc- tural non-weighting form traveler,and focus the introduction on the characteristics of the form trav- eler and the checking process of the key components of this form traveler able to be referred for the construction of the similar bridges.
该文介绍了人字式组合三角形稳定结构无压重挂篮的设计方案,其中着重介绍了挂篮的特点及该形式挂篮关键构件的验算过程,为进行类似桥梁施工提供一定的参考。
2.
Combined with the course of construction of Songyuan Longhua Songhua River super-sized bridge,methods of temporary anchor of beam and pier,structure and function of the form traveler,and improved structure for the pasret-hung casting of the 1# pier base were introduced in this paper.
结合松原龙华松花江特大桥的施工过程,介绍墩梁临时固结的措施,以及挂篮的细部构造及其各部件的功能,并对1#块悬臂浇注时,挂蓝的改进进行阐述。
3.
However, under the special condition of the construction been strictly limited by the time and temperature, it is more applicable to use the form traveler taken as the counterweight matter of the closing-up section.
但在施工受到时间和温度严格限制的特殊条件下,使用挂篮作为合龙段的配重物是比较适用的。
6) suspended wagon
挂篮
1.
Design meditation,structure characteristic,calculation,construction and control of QGL-170 triangle suspended wagon in Qiantangjiang Five Bridge were introduced in this paper,which will give reference for design and construction of similar suspended wagon.
挂篮是为满足桥梁悬臂浇筑施工需要而专门设计,并加工制造的一种桥梁施工专用设备。
2.
The construction technique of suspended wagon, construction situation and notice of folding the border and middle span, attentions to suspended pouring craft of box beam of Nan ansan Bridge are introduced in the paper.
文中介绍了南岸三桥主桥箱梁悬浇挂篮施工工艺、边中跨合拢施工情况和注意事项及箱梁悬浇施工注意事项,为以后类似桥梁施工提供参考。
3.
This paper mainly introduces the construction techniques of the 125 m span continuous rigid frame of the Luosiling Bridge on the transit superhighway (from Jurong Sector to Luoman Sector) in Liuzhou City of Guangxi Zhuang Autonomous Region and the working principles of the suspended wagon,and the construction and cantilever grouting method,which provide some references for the similar engineering.
介绍了广西柳州市国道过境公路(雒容至洛满段)螺丝岭大桥125m跨径连续刚构施工工艺及其挂篮的工作原理、施工和悬臂浇注方法,为类似工程提供了借鉴和参考。
补充资料:预应力
分子式:
CAS号:
性质:试验中试样所受到的预加的恒定静态应力,单位为Pa。在生热性疲劳试验中,如固特里奇屈挠试验中,一般都施加一恒定预应力,使试样产生一静态变形,再叠加一周期压缩变形进行试验,通常预应力的大小会影响试样的疲劳寿命,预应力越大,则试样寿命会越明显缩短。也有的先施加一静态压缩变形,再叠加周期性剪切变形进行试验。
CAS号:
性质:试验中试样所受到的预加的恒定静态应力,单位为Pa。在生热性疲劳试验中,如固特里奇屈挠试验中,一般都施加一恒定预应力,使试样产生一静态变形,再叠加一周期压缩变形进行试验,通常预应力的大小会影响试样的疲劳寿命,预应力越大,则试样寿命会越明显缩短。也有的先施加一静态压缩变形,再叠加周期性剪切变形进行试验。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条