1) Banduo hydropower station of the Yellow River
黄河班多水电站
1.
Waste grassland is the main native ground type in the project of Banduo hydropower station of the Yellow River.
荒草地是黄河班多水电站工程区最主要的原生地面类型,阐明其产流过程,可为揭示与评价该工程区水土流失过程与强度奠定重要基础。
2) Banduo Hydropower Station
班多水电站
1.
Failure mechanism of No.1 toppling rock mass at left bank of Banduo Hydropower Station;
班多水电站左岸Ⅰ号倾倒体破坏机制分析
3) Daxia Hydropower station on the Yellow River
黄河大峡水电站
4) Gongboxia Hydropower Station
黄河公伯峡水电站
1.
Calculation of Design Flood for Gongboxia Hydropower Station;
黄河公伯峡水电站设计洪水计算
2.
In view of optimal design of construction flood for Gongboxia Hydropower Station, this set of method is briefly introduced, and a clearer reply is given to some viewpoints and doubts existed for the time being.
通过黄河公伯峡水电站施工洪水优化设计过程对该套方法作简要论述,并就目前存在的一些观点及疑问给予了较为明确的回答。
6) The Maerdang hydropower station on the Yellow River
黄河玛尔挡水电站
补充资料:班多水电站
班多水电站 |
Pandoh Hydropower Station |
概 述 |
班多水电工程(又称比阿斯-萨特莱杰连接工程)位于印度喜马偕尔邦、印度河支流比阿斯(Beas)河上。工程主要为了灌溉、防洪和发电等综合效益。粘土心墙堆石坝,最大坝高76m,坝顶长411m,体积145.5万m3。水库总库容0.41亿m3,面积1.65km2。 |