说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 临时用电配电
1)  temporary electricity supply
临时用电配电
2)  temporary electricity usage
临时用电
1.
Safety management for temporary electricity usage in construction site;
浅谈施工现场临时用电安全管理
2.
Discussion on the problems needing attention of temporary electricity usage on construction site;
浅析施工现场临时用电应注意的问题
3.
Simplified design for temporary electricity usage in construction sites;
建筑工地临时用电简化设计
3)  temporary power
临时用电
1.
Software design and application for construction organization design of temporary power;
临时用电施工组织设计软件的研制及应用
2.
The safety supervision controlling of temporary power in construction site
施工现场临时用电安全监理控制
3.
Common fault of temporary power in construction site and safety supervision
建筑施工现场临时用电的通病及安全监督
4)  temporary power supply
临时用电
1.
Research of temporary power supply on construction site;
浅谈建筑施工现场临时用电
2.
From the angle of supervising, the article puts forward the author’s view on how to do safety management and how to avoid risks in temporary power supply in the construction site in terms of the check for the organizational design, control for the entity’s quality as well as the compulsory implementation of safety measures under the supervising engineer.
文章力图从监理工作的角度出发,对临时用电组织设计的审查、现场临时用电实体质量的控制及现场临时用电工程的监督实施几个方面,就如何做好施工现场临时用电的安全管理工作,如何规避风险,提出自己的看法。
5)  temporary electricity
临时用电
1.
On the security management of the temporary electricity in architectural constructions;
谈建筑施工的临时用电安全管理
2.
In the light of the problems existing in the zero connection protection system of temporary electricity in construction site,the paper puts forward the causes of the problems and the solutions to solve the problems.
针对施工现场临时用电接零保护系统存在的问题,分析了原因提出解决问题的方法。
6)  temporary supplying and consuming electricity
临时供用电
1.
From a lot of aspects such as load computation, electrified wire netting plan, wire section choice and self-equipped power plant construction, this paper has a theoretical analysis on temporary supplying and consuming electricity scheme during construction, and give out steps, methods and examples on applying such scheme.
从负荷计算、电网规划、导线截面选择和自备发电站组建等方面对施工临时供用电方案进行理论分析 ,并给出拟定该方案的步骤、方法及实例。
补充资料:变更用电


变更用电
additions or alterations to existing electrical installations

  b IOngeng yongdlon变更用电(additions or alterations to existingeleetrieal installations)改变由供用电双方签订的供用电合同中约定的有关用电事宜的行为。用户由于自身经营、生产、建设、生活等的变化而要求改变原订供用电合同中约定的用电事宜,供电企业应予受理。变更用电须由用户提出申请,并携带有关证明到供电企业用电营业场所办理手续,变更供用电合同的约定。中国的《供电营业规则》(见供电管业规则)中规定变更用电包括减容、暂停、暂换、迁址、移表、暂拆、过户、分户、并户、销户、改变供电电压等级和改变用电类别等项内容。 减容减少供用电合同约定的用电容蚤。中国规定减容须在5天前向供电企业提出申请。减容必须是整台或整组变压器停止运行或更换小容量变压器用电。用户申请减容的目的是要减少基本电费的支出。减容时间的长短,根据提出的申请确定,但最短期限不得少于6个月,最长期限不得超过2年。在减容期间,供电企业应保留其所减容量的占有权。 暂停暂时停止全部或部分受电设备的用电.因设备检修、生产临时性调整或季节性生产的用户,为减少上述时期内的基本电费支出,可以提出暂停用电的申请。暂停用电也必须是整台或整组变压器停止运行。在每一日历年内,用户可申请全部或部分用电容t的暂时停止用电两次,每次不能少于15天,一年累计暂停时间不能超过6个月。 暂换临时更换大容量变压器。因受电变压器故障而无相同容量变压器替代,需要临时更换大容量变压器时,用户可申请办理暂换手续。暂换必须在原受电点内整台的替换受电变压器,替换变压器的使用时间一般也有限制,10kV及以下的不能超过2个月,35kV及以上的不能超过3个月。 迁址迁移受电装置的用电地址.迁址有可能引起供电点的改变而影响供电企业供电设施的适应能力。因此,用户迁址须在5天前提出申请,办理手续。私自迁址是《供电营业规则》中规定的违约用电行为。 移表移动电能计童装里安装位置。因修缮房屋或其他原因需要移动电能计量装置的安装位里时,用户应提出申请并办理有关手续后,由供电企业组织实施,用户不得自行移动,以保证电能计量装里准确、可靠的计量。 暂拆暂时停止用电并拆除电能计量装!。因修缮房屋等原因需要暂时停止用电并拆除电能计量装t时,用户可提出申请办理有关手续。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条