说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 临时限电
1)  Temporary load curtailment
临时限电
2)  temporary speed restriction
临时限速
1.
It is not only active to achieve the control of active balise message output and the checking and executing of temporary speed restriction,but also responsible for those functions such as ZPW-2000A/K track circuit code,the logic of section signal lighting, inter-station communication, direction-changing of section and station.
车站列控中心是客运专线列控系统的核心设备,它不仅要实现控制有源应答器的报文输出和临时限速的核对与执行,还要负责ZPW-2000A/K轨道电路的编码、区间信号机点灯逻辑、站间通信、区间及站内轨道电路改方等逻辑功能。
3)  voltage,threshold
临限电压
4)  current,threshold
临限电流
5)  temporary restricted zone
临时限制区
6)  temporary restraining order
临时限制令
1.
Around the plaintiff\'s application for temporary restraining order,beginning with the four applying conditions,the court said the last three conditions were met,and placed emphasis on the first one,i.
围绕着原告颁发临时限制令的请求,法院从颁发临时限制令的四个条件出发,在说明后面三个条件具备后,着重论证第一个条件,即是否有胜诉的充分可能性。
补充资料:关于临时建设和临时用地

临时建设是指必须限期拆除、结构简易、临时性的建筑物、构筑物、道路、管线或其他设施;临时用地是指由于建设工程施工、堆料或其他原因,需要临时使用并限期收回的土地。批准临时建设和临时用地的使用期限,一般均不超过两年。
临时建设和临时用地都对城市规划的实施产生重要的影响,因此,城市规划行政主管部门必须对城市规划区内的临时建设和临时用地进行严格的规划管理。任何单位和个人需要在城市规划区内临时使用土地或进行临时建设都应当征得城市规划行政主管部门的同意,不得影响城市规划的实施。
鉴于临时建设和临时用地的情况比较复杂,各地的管理体制和管理条件又不尽相同,因此,《城市规划法》第三十三条规定:“在城市规划区内进行临时建设,必须在批准的使用期限内拆除。临时建设和临时用地具体规划管理办法由省、自治区、直辖市人民政府制定。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条