说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 试装
1)  Preassemble ['pri:ə'sembl]
试装
2)  installation debugging
安装调试
1.
In combination with the ventilation system transformation project of Shanxi Lanhua Group Jushan Coal Mine,some experiences are summarized about type selection and installation debugging of hot-blast stove in the well.
结合山西兰花集团公司莒山煤矿通风系统改造工程,总结了在井口热风炉选型和安装调试中的一些经验。
2.
Ltd,the experience of type-selection design and installation debugging of explosion-proof axial flow fan is summarized.
结合霍州煤电集团公司通风系统改造工程,总结了在防爆对旋轴流式通风机选型设计和安装调试中的一些经验。
3.
Combined with the modification project of ventilation system in Yangou Coal Mine of Leping Coal Mining Bureau, experience of typeselection design and installation debugging of explosionproof axial flow fan in relative rotation is summarized.
 结合乐平矿务局沿沟煤矿通风系统改造工程,总结防爆对旋轴流式通风机在选型设计和安装调试中的一些经验。
3)  testing device
测试装置
1.
Development of the Testing Devices in Simulating Conditions for the Ultrahigh Pressure Electro-Hydraulic Stop Valves;
超高压电液截止阀实况模拟测试装置的研制
2.
Valve torque testing device for testing and research;
阀门启闭扭矩连续测试装置的试验与研究
3.
Development of a dynamic characteristic testing device of rotational electrical apparatus with opto-electromechanical technology;
光机电转动式电器动态特性测试装置的研究
4)  test equipment
试验装置
1.
Logical control unit emulational test equipment for locomotive;
机车逻辑控制单元仿真试验装置
2.
On the basis of analyzing typical impact erosion and cavitations erosion test equipment and methods in sandy environments,in view of the special wear patterns in our national hydraulic machinery and hydraulic architecture,a new type of water jet test equipment and method that can be applied to study submerged synergic wear of impact erosion & cavitations erosion was introduced.
实验室泥沙冲蚀与气蚀复合磨损模拟试验结果表明,该试验装置设计合理,可以在较短时间内获得试验数据。
3.
The paper introduces a kind of simulation test equipment of the mash screen.
目前国内外的筛管试验装置主要是对其材料或局部进行试验,难以评价筛管的整体性能,特别不适用于金属棉防砂管(简称优质筛管)。
5)  Installation and debugging
安装调试
1.
Comprehensive automation system of 500 kV Gulu Substation and its installation and debugging;
500kV顾路变电站综合自动化系统及安装调试
2.
Expert system used in installation and debugging of hydraulic system;
液压设备安装调试中专家系统的应用
3.
The supervisory system of contact net load switch is introduced in Liupanshui hinge; moreover its method of installation and debugging and attentive key point are given combining with this system.
介绍了六盘水枢纽接触网负荷开关监控系统 ,并结合该系统给出了其安装调试的方法及其注意要
6)  test device
试验装置
1.
Behavior testing and errors analyzing on an abrasive wear test device;
一种磨料磨损试验装置及其性能测试与误差分析
2.
Design of the test device for the frictional abrasion of the sucker rod centralizer
往复式抽油杆扶正器摩擦磨损试验装置设计
3.
The test device provides the advanced way to the pressure gradient and flow state experiment of Multiphase Flow in well removed liquid and produced gas, conventional gas production in continuous gas-lift simulation experiment, and analysis of lift efficient of continuous gas lif.
完成了球塞气举试验装置的结构和控制系统设计。
补充资料:模具安装、调试及取卸作业规范

摘要:1 目的 通过对模具的安装、调试及取卸作业进行规范,从而确保设备、人身安全,并稳定生产出合格产品。 2 适用范围 本规范适用于模具的安装、调试及取卸作业。 3     作业要求 序号 作业程序 作业方法 注意事项 1 将滑块下降至下死点 A. 将行程
1 目的
通过对模具的安装、调试及取卸作业进行规范,从而确保设备、人身安全,并稳定生产出合格产品。
2 适用范围
本规范适用于模具的安装、调试及取卸作业。
3     作业要求
序号 作业程序 作业方法 注意事项
1 将滑块下降至下死点


A. 将行程选开关切换至“寸动”位置。B. 用“双手按钮”将滑块下降至下死点。


操作时注意观察曲轴的角度指示计,以确保滑块在过下死点1~2度位置停止。
2 查看冲床的装模高度 A. 查看模具的合模高度。B. 把冲床的装模高度调至高出模具的合模高度(如加垫铁,则加上垫铁高度)5~10mm。


如冲床的装模高度低于模具的合模高度或模具高度加垫铁厚度之和,则模具的安装调试时容易将模具损坏。
3 模具安装面的检查、修整及清理 A 要认真清理冲床滑块底面、工作台及模柄孔上的杂质和铁屑。B. 修整工作台及垫铁不平表面。C. 清理模具表面。D. 确认气垫装置。


A. 注意工作台表面是否凸凹不平,如不平用油石进行修整。B. 确认模柄固定螺栓是否完好。C, 使用气垫时确认气垫顶杆是否变形,放置位置是否适宜,长度是否适宜,是否夹废料。
4 模具放置在冲床的工作台上 A. 用适宜的搬运工具搬运模具。B, 滑块提升至上死点,放置模具。C. 确认模具的安装方向、结构、状态等。


搬运模具时将叉车的叉子放低后搬运模具。
5 模具的安装 A. 模具安装在工台中心,并调整位置、方向。B. 确认垫铁位置。C, 按下电机的“停止”按钮,当行程速度20SPM左右时,利用飞轮的惯性,慢慢下降滑块,将模柄装入滑块的模柄孔中。


A. 顺送模具送料方向的中心线与材料的中心线应保持一致。B. 确认模具的落料孔位置,以防被垫铁堵住。并避免垫铁之间跨距过大,造成模具变形。C. 注意利用“寸动”行程操作!
6 粗调闭合高度 A. 完全松开模柄螺栓。B. 下降滑块,使之靠上上模表面。


A. 用手推一推,查模具是否移动。B 必须在下死点进行操作。C. 有刻印、防弹凸台、弯曲、拉深模具必须放件进行调试。
7 固定上模 A. 首先确认模具固定装置。B, 对角固定模具2处或许处。C. 拧紧模柄固定螺栓。


说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条