1.
Installs the Debugger Interface for stored procedure debugging.
安装调试程序接口以调试存储的过程。
2.
The debugger is not properly installed on machine '%1'.
没有在计算机“%1”上正确安装调试器。
3.
Has the machinery been put up ready for the broadcast?
广播机器设备安装调试好了没有?
4.
Equipment in the factory responsible for the installation and testing.
负责设备在工场的安装调试工作。
5.
Handle to the thread that installed the debugging filter function.
安装调试过滤方法的线程的句柄。
6.
Survey on Installation and Debugging Process of Air Compressor in AISC 1780 Engineering
鞍钢1780工程空压机安装调试过程概述
7.
CONSTRUCTION INSTALLATION AND ADJUSTMENT OF CHORD ARROW TRAVERSE FOR GEHEYAN HYDROPOWER PROJECT
隔河岩工程弦矢导线施工及安装调试
8.
Summary of Installation for 35kV Transformer Substation Auto System
35kV变电站自动化系统安装调试总结
9.
Installation and Adjustment of NUM Numerical Control System in Gear Cutting Machine
数控插齿机NUM数控系统的安装调试
10.
Considerations about some common problems in installation and debugging of air conditioning engineering
对空调工程安装调试出现的一些问题的看法
11.
Co-ordinate the vendor assistance required during the construction and commissioning activities.
在安装和调试期间协调和协助供货商。
12.
Coordinate with sub-contractor on the installation of new equipment and debugging.
负责完成新进设备的安装和调试。
13.
Corrugated line machine installation, machine adjustment.
瓦楞纸板生产线设备安装,机器调试。
14.
The period for commissioning shall be Six (6) months from the date of issuance of Certificate of Erection.
调试期为安装证书签发后的陆(6)个月。
15.
Be responsible for the new energy equipments; adjust to try, check and acceptance.
负责能源设备的安装、调试和验收工作。
16.
Assembly and adjustment of high atmosphere detection laser radar
高空大气探测激光雷达的安装与调试
17.
Construction,Installation and Commissioning Experiences for 900 MW Units;
900MW机组的施工、安装和调试经验
18.
Eddy Current Transducer Installation and Debugging in Turbine Axis Displacement and Differential Expansion
汽轮机轴向位移、胀差的安装与调试