1) early removing system
早拆体系
1.
The construction technology of concrete floor crack controlling under early removing system
早拆体系下混凝土楼板裂缝控制施工技术
2) early dismantling supporting system
早拆支撑体系
1.
In this paper the theoretical foundation, principle, plan arrangement and design, the stripping strength calculation and flexibility checking calculation of early dismantling supporting system are introduced.
介绍了模板早拆支撑体系的理论依据、工作原理、平面布设、拆模强度的计算和挠度的验算 ,并进行了经济分析 ,提出该技术优点突出 ,具有重要的现实意
3) earlier disassembly system of formworks
模板早拆体系
1.
Simple discuss on the application and development of earlier disassembly system of formworks in construction;
浅谈模板早拆体系在施工中的应用和发展
4) Early Removal Formwork System (ERFS)
早拆模板体系
1.
The main research purpose of the paper is the analysis of the Early Removal Formwork System (ERFS) in the process of construction by the means of Finite Element Method (FEM), and the theory support to the ERFS criterion.
论文的主要研究目的是对混凝土构件施工中的早拆模板体系进行有限元方法分析,并为其早拆的规范提供理论支持。
5) TLC early removal formwork system
TLC插卡型早拆体系
6) Design of early dismantled support system
早拆支撑体系的设计
补充资料:多孔陶瓷支撑体膜
分子式:
CAS号:
性质:在多孔陶瓷体上附着的微孔陶瓷膜层。膜层厚度一般在几微米到几十微米,外径孔径一般为0.1~0.5μm,个别也有厚度达3~5μm、孔径10μm的。多采用氧化铝、二氧化钛和二氧化锆等作膜材料。制法是:用电机带动陶瓷支撑体旋转,当溶胶液(膜材料)滴落在支撑体上,就会迅速地敷覆到支撑体表面,待溶剂蒸发、凝胶化和干燥成膜后,经热处理而制成氧化物薄膜。现已为食品(含饮料)、医药、生物技术和环境保护等领域开发利用。
CAS号:
性质:在多孔陶瓷体上附着的微孔陶瓷膜层。膜层厚度一般在几微米到几十微米,外径孔径一般为0.1~0.5μm,个别也有厚度达3~5μm、孔径10μm的。多采用氧化铝、二氧化钛和二氧化锆等作膜材料。制法是:用电机带动陶瓷支撑体旋转,当溶胶液(膜材料)滴落在支撑体上,就会迅速地敷覆到支撑体表面,待溶剂蒸发、凝胶化和干燥成膜后,经热处理而制成氧化物薄膜。现已为食品(含饮料)、医药、生物技术和环境保护等领域开发利用。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条