1.
The Study of Early-dismantling Template System and Dismantling Template Time of Concrete Structure;
混凝土结构早拆模板体系与拆模时间的研究
2.
The Application and Development of Earlier Disassembly System of Formworks in Construction;
模板早拆体系在施工中的应用和发展
3.
The construction technology of concrete floor crack controlling under early removing system
早拆体系下混凝土楼板裂缝控制施工技术
4.
Application Analysis of Reinforced Concrete Slabs in Early Disassemble Steel Formwork System
钢构早拆体系中钢筋混凝土板应用分析
5.
The Aseismic Perfformance Research into Non-Demoulding Formwork Board and Shear Wall Structure System;
免拆模板及其剪力墙体系抗震性能研究
6.
Analysis of construction technology for early dismantlement of floor formwork under the least favorable conditions
最不利条件下楼板模板早拆施工技术分析
7.
Designing and Life Cycle Cost Analysis on Composite Shear Wall System with Heat Preservation Formwork;
免拆保温墙模复合剪力墙体系模板设计及寿命周期成本分析
8.
The Research of the Early Removal Formwork System s Impact to the Concrete Structures;
建筑施工模板早拆对混凝土结构影响研究
9.
DISCONNECT & REMOVE THE BODY CONTROL MODULE FROM THE JUNCTION BLOCK.
从集成板上拆下并移走主体控制模组。*
10.
THE TECHNOLOGY OF ASSEMBLED FIELD-CAST CONCRETE WALL WITHOUT DEMOULDING
拼装式现浇混凝土墙体免拆模板技术
11.
Support System Application for Fast Demolition of Dense Rib Floor
密肋楼板快拆支撑体系在工程中的应用
12.
Remove the door module from the trim panel.
从饰板上拆卸车门模组。
13.
Calculation Design of Supporting System of Floor Bottom Formwork and Time Control of Formwork Removal
浅谈楼板底模支撑系统计算设计及拆模的时间控制
14.
On the integral self-lifting steel platform system with the self-raising formwork systems
整体自升式钢平台模板体系与爬升模板体系
15.
Experimental Study on Non-Dismantling Template of the Concrete Contains Glass Fiber
玻璃纤维混凝土免拆模板的实验研究
16.
Reserch on Printed Circuit Board Electronic Components Dismantling Model and Experiments
电路板电子元件拆除模型与实验研究
17.
Remove the right front fender inner splash shielRefer to Group 23 Body for the procedures.
拆卸右前挡泥板的内挡泥板。至于拆卸步骤请参考单元23-车体。
18.
Analysis and Study on Energy Efficiency and Anti-Seismic Performance of Complex Shear Walls System without Demoulding Board;
免拆墙模复合剪力墙体系保温性能与抗震性能的分析与研究