说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 热熔标线施工设备
1)  Equipments for thermotropic marking construction
热熔标线施工设备
2)  hot-melt application
热熔施工
3)  construction equipment
施工设备
1.
The study on condition-based maintenance of construction equipment for hydropower projects;
水电工程施工设备状态检修应用研究
2.
Actual situation and probe of water project construction equipment repair;
水电工程施工设备维修的现状及探索
3.
Analysis on emergency support of construction equipment for risk-elimination of landslide dam;
堰塞湖除险工程施工设备保障分析
4)  torching mark
热熔标线
1.
According to the damage situation of cement concrete pavement torching mark,the paper analyzed the cause and proposed the countermeasure for reference.
根据山西京大高速公路水泥混凝土路面热熔标线的破损情况,进行了原因分析并提出了对策。
5)  thermal facilities
热工设备
1.
The software of intelligent condition-based diagnosis and analysis system for thermal facilities in power plants includes data acquisition,data processing,facility fault diagnosis and condition-based diagnosis.
电厂热工设备智能状态诊断分析系统软件是以电厂热工设备为对象,主要由数据采集、数据处理、设备故障诊断和状态诊断等环节组成。
6)  Thermodynamic equipment
热工设备
1.
Energy conservation technology of thermodynamic equipment in building and sanitation ceramic industry;
建筑陶瓷工业热工设备节能技术探讨
补充资料:气体绝缘金属封闭开关设备施工


气体绝缘金属封闭开关设备施工
installation of GIS

q{t一Jueyuonl一nshu fengb!k01guon shebe一sh}gong气体绝缘金属封闭开关设备施工(installa-tion of GIS)35kV及以下的GIS装里是柜式整体供货的,110kV及以上的设备是分若干隔室供货的.安装工作的要求是装里的绝缘合格,导电部分接触良好,SF。气体无泄漏,传动操作正确可靠. 安装前准备工作安装现场要做好防尘、防雨措施,保证照明和通风装里完好。检查及清理导体接触面和金属外壳,法兰接触面及0形密封圈应光滑无毛刺,用有机溶剂清洗干净。在法兰接触面上均匀涂上密封硅脂,然后把隔室连接,组装成开关装里的整体。要控制密封硅脂在空气中的暴礴时间,以防硅脂干结,降低密封效果。对SF。气体含水量进行检验,如不合格应进行处理.检查基础标高和中心线,以保证设备就位的位t正确。 本体安装将组装好的开关装里吊装就位,先将第一个间隔就位,找正找平固定好。再将相邻间隔就位、母线隔室就位、连接法兰面。再依次将各间隔就位连接、固定.要求各间隔连接处不受机械应力,以防止气体泄漏。就位固定后测试导电部件接触电阻.然后充SF。气体。充气前先按照制造厂规定的真空值和气体压力值,抽真空、充氮,要反复数次,以保证各隔室中无残留的空气和水分。然后注人经检验合格的SF‘气体.充气后检查各连接处无气体泄漏。最后进行操作机构安装、管道连接和外部电缆接线。 电气试验主要项目有:①测试开关、闸刀等部件的各特性参数;②连锁试验;③绝缘电阻测量、交流耐压试验;④验收合格后进行冲击合闸试验。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条