1) main building with frame-bent
混合结构主厂房
1.
Experiment and analysis of dynamic characteristics of a main building with frame-bent structures in large thermal power plants
大型火力发电厂框排架混合结构主厂房动力特性试验与分析
2) reinforced concrete main power building
钢筋混凝土结构主厂房
3) main workshop structure
主厂房结构
1.
Combining with the destruction situation of the power plant in Wenchuan large earthquake,the author analyzes causes of the main workshop structure seismic destruction,provides attention problems in the main workshop structure anti-seismic design,so as to establish multi-line defense of the main workshop anti-seismic,ensure people\'s life and property safety.
结合火力发电厂在汶川大地震中的破坏情况,分析了主厂房结构震害产生的原因,提出主厂房结构抗震设计中应当关注和重视的一些问题,以构筑主厂房抗震的多道防线,保证人民的生命和财产安全。
5) structure type of main plant house
主厂房结构选型
补充资料:厂房钢筋混凝土结构安装
厂房钢筋混凝土结构安装
installation of reinforced concrete structure for workshop building
e卜ongfong gongjin hunn一ngtu Jiegou onzhuang厂房钢筋混凝土结构安装(installation ofreinforeed eonerete strueture for workshoPbullding)进入现场的厂房结构钢筋混凝土构件,经弹线并做好各种必要的标志后,选择合理吊点绑扎、吊装,经调正定位,固定到设计位置上的作业。根据现场条件和构件几何尺寸、重量的实际情况,构件可以在安装现场预制,亦可在工厂预制.钢筋混凝土构件有预应力构件和非预应力构件两种。 施工准备根据开口施工或闭口施工方案以及安装顺序和吊装工艺,安排构件预制的地点;重型柱、大吊车梁及大跨度屋架的预制位置应尽可能靠近安装地点,放在起重机的工作半径内,并选好合适的摆放方向。叠浇的水平预制件还要有正确的起模翻身和扶直措施。重型构件的预制场地若为回填土层时,应将其夯实,以防止地基下沉而损坏构件。构件吊装时,必须按设计规定的吊点或经过吊装应力核算确定的吊点进行绑扎,并用胶皮、厚纸等对构件表面进行保护,必要时应设置专用吊装梁或吊具。 安装方法钢筋混凝土结构的安装作业方式与钢结构的基本相同,可分单件流水作业和综合安装作业两种。其安装顺序分为吊装、找正固定和连接。 吊装较大面积的单层工业厂房或多跨厂房可用多台吊机分片、分段同时进行吊装,或用不同性能吊机进行协同吊装,如用履带式起重机吊装柱子和吊车梁,用塔式起重机吊装屋面结构。对于多跨厂房可选用回转半径较大的塔式起重机吊装2~3跨的构件。进行多跨厂房吊装时,要根据各跨特点,以其中一主跨为基准,先行安装,邻跨吊装则滞后2一3线,以合理分配公差。多层厂房吊装宜选用起重高度较大的塔式起重机。 找正固定首先应进行柱子和柱间支撑的固定。屋面结构的第一个跨间要先行找正和固定,以作为整个屋面结构安装的基础。吊车梁的调整固定一般在屋架固定后进行。多跨厂房应以主跨为基准进行调整固定,然后再固定其余各跨。多层厂房应先从下部构件开始固定,合格后再逐层调整固定上部各层结构。多层厂房的多节柱安装质量对整个厂房的安装质量有很大影响,安装时要注意各节柱的垂直度和平面位置的正确性,要控制好偏差,避免误差单向积累。在柱节点符合要求后再固定与之相连的梁与柱牛腿节点。多节柱找正时还要考虑阳光照射、温差对柱子垂直度的影响,柱子找正时要保持其自身的垂直度,不能以外力强拉。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条