说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 厂房结构
1)  powerhouse structure
厂房结构
1.
Study on the self-vibration characteristics of powerhouse structure of the Three Gorges Hydropower Station;
三峡水电站厂房结构自振特性研究
2.
In case of high tailwater pressure, in order to meet the requirements of integral stability and stress in design of powerhouse structure, the some issues shall be considered, such as: joints between powerhouse and dam, structure types of machine hall and auxiliary plant, structure types of retaining works.
在高尾水位的情况下,为了满足水电站厂房的整体稳定和应力要求,在厂房结构设计和工程措施上,主要应注意以下问题:厂坝分缝,主副厂房结构及挡水结构型式,减小扬压力,增加迎水面垂直向下的荷载,增加厂房基底宽度,充分利用厂坝基岩面形成的岩坝,优化尾水管底板结构型式。
2)  workshop structure
厂房结构
1.
This paper tests the influences of the machine vibration on the workshop structure by using the vibration testing method,and analyzes on the vibration regularity and reasons of the structure floor based on the testing result,which provides the reliable scientific foundation for the safety evaluation on the floor structure.
应用振动测试方法测试机器振动对厂房结构的影响,并根据测试结果分析了结构楼板振动规律及原因,对厂房结构进行安全评价提供了可靠的科学依据。
2.
This article breached traditional disposal way about workshop extension crack and handled design methods of "resisting " and "setting free" to deal with extension crack in unite workshop structure in the Tyre Factory on the South-West of China , it gained favourable effect and took some references to its next developing .
突破传统对厂房伸缩缝的处理方法,充分运用“抗”与“放”的设计思路来处理西南某轮胎厂联合厂房结构中的伸缩缝,取得了较好的效果,为今后同类工程的设计提供了一些参考意见。
3)  structure workshop
结构厂房
4)  steel structure workshop
钢结构厂房
1.
A method is introduced for the calculation of the intensity of the welding column of steel structure workshop and cantilever shoulder nodal point.
介绍了钢结构厂房焊接式立柱与悬臂牛腿节点强度的计算方法。
2.
From the heat preservation heat insulation,the fire protection,the temperature expands and contracts,the room covers the support,the structure anticorrosion,set up the surface design and so on several aspects to make the discussion to the steel structure workshop design,causes the steel structure workshop tends the security,the economy,artistic.
从保温隔热、防火、温度伸缩、屋盖支撑、结构防腐、立面设计等几个方面对钢结构厂房的设计作了探讨,以使钢结构厂房更趋于安全、经济、美观。
5)  structure of building
厂房结构物
6)  main workshop structure
主厂房结构
1.
Combining with the destruction situation of the power plant in Wenchuan large earthquake,the author analyzes causes of the main workshop structure seismic destruction,provides attention problems in the main workshop structure anti-seismic design,so as to establish multi-line defense of the main workshop anti-seismic,ensure people\'s life and property safety.
结合火力发电厂在汶川大地震中的破坏情况,分析了主厂房结构震害产生的原因,提出主厂房结构抗震设计中应当关注和重视的一些问题,以构筑主厂房抗震的多道防线,保证人民的生命和财产安全。
补充资料:厂房结构安装


厂房结构安装
installation of building structure

  别构件还采用了栓焊混合连接。冶金工业厂房一般均为单层多跨或多层厂房。厂房内有大量的地下构筑物(如地下油站、活套坑等)和深、宽、厚、长的设备基础。有些重型厂房高度达60m以上,跨度大、延伸长、吊车荷载重、构件尺寸大。这些特点增加了结构安装中吊机选择、布设、行驶以及安装工艺等的复杂性。厂房结构安装分安装前准备和安装施工两个步骤。 安装前准备安装单位在安装前,为确保按时开工和协调、连续、高效施工,需进行的技术准备、施工组织准备、构件供应和吊装机械选用等准备工作。 技术准备主要包括:(l)熟悉、核对图纸,提出有关节点构造、连接方式、构件分段、安装精度等方面的意见与要求。(2)在熟悉、核对图纸的基础上,确定钢结构分段、预装要求,并以书面形式向制造单位提出。(3)组织绘制结构施工详图。(4)根据工程性质及设计要求,明确应采用的施工验收规范及必要的附加技术标准,确定需执行的操作规程及工法。(5)根据构件特点、安装位置、工程施工程序和开闭式施工要求等,合理确定起重机械的规格、型号及需用数量。(6)根据施工总网络进度要求,制定安装细目网络进度,明确安装顺序及与土建等有关专业的配合衔接和交叉关系。在此基础上提出构件供应计划、劳动力需用量和辅助机具需用量。(7)对施工场地平面(含构件堆场)的使用、大型临时设施(含水、电、道路)、吊车站点等做好统筹安排。一(8)结合工程特点及要求、制定复杂部位及高难安装项目的专项(细目)技术方案,确定推广的先进技术项目及要求,组织编制安全技术措施和质量控制要点。(9)在上述工作基础上,编制厂房结构安装施工组织设计。(10)冬期施工时,应根据当地气候特点、施工情况、现场条件等,采取防寒及防滑措施。 施工组织准备主要包括:(1)组织落实施工场地,平面规划安排,大型临时设施的竣工,水、电供应,道路畅通,大型起重机械及辅助机具进场,各种构件分期分批进场等。(2)组织安装队伍进场,进行技术交底;组织测量人员复测核实厂房轴线、基础标高及与上一工序的交接;提前组织新技术项目或其他特殊情况需要进行的攻关或操作培训;开工前完成电焊工考试;以及对所有需作检定的计量器具的检定。(3)在施工组织方案、作业计划及专项技术方案批准后,应着手编制工程造价预算。(4)安装过程中认真做好设计变更的处理、工程质量检查及资料的整理,竣工后及时办理交工或交接。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条