说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 徐变加载装置
1)  creep-loading device
徐变加载装置
1.
To obtain 75-ton loading force for creep experiment,a 95-ton creep-loading device was designed and manufactured,which solve the large-tonnage loading problem in concrete creep experiment.
为获得徐变试验所需75t的加载力,设计并制造出95t的徐变加载装置,解决了混凝土徐变试验大吨位加载的问题。
2)  creep equipment
徐变装置
3)  Loading device
加载装置
1.
Design of a loading device with fundus strain on cells;
一种细胞基底拉伸加载装置的设计
2.
A loading device for fatigue test of landing gears is developed in this paper to provide a solution to the displacement of load applying point with deformation of unit under test.
在飞机起落架疲劳试验中,常会遇到载荷施加点随试验件的变形而移动的问题,本文设置了一种起落架疲劳试验随动加载装置,阐明了该装置的结构及工作原理,解决了载荷施加点随试验件变形的问题,同时应用于某型飞机起落架疲劳试验中,具有较大的现实意义和应用价值。
3.
It is proved that the loading device had enough strength and rigidity through specimen experiment of 41 truss joints of different shape and the device was suitable for loading for experiment of N-shape or T-shape Truss Joint.
本文介绍了用于桁架T型节点、N型节点试验的钢筋混凝土五边形封闭框加载装置的设计步骤以及相应构造措施。
4)  load device
加载装置
1.
The thesis relates two main components of the load device.
阐述了改进后的“蜗轮-内斜齿式加载装置”的两个主要部件:内斜齿加载器和生力器的结构及工作过程,经过实际验证,该机构具有结构简单、紧凑,且使用方便、加载可靠的特点。
2.
The test result indicates that the hydraulic load device achieves the desired results.
通过分析转辙机可靠性试验对加载装置的要求,认为液压式加载比机械式加载更适合转辙机的可靠性试验。
5)  loading equipment
加载装置
1.
Focusing on the couple relationship in an established secondary regulated torque loading equipment between its velocity system and torque system, a decouple network was designed with construction process illustrated.
给出了考虑物理可实现性的仿真曲线 ,结果表明 ,该解耦网络实现了二次调节加载装置转速转矩间的动态近似完全解
2.
The mathematical model of an established hydrostatic driving secondary regulated loading equipment was analyzed for the origin of couple relationship.
通过二次调节扭矩加载装置数学模型研究 ,从硬件角度得出实验装置中二次调节转速系统和转矩系统间的耦合关系与检测信号的类型和传感器的安装位置有关的结论 。
3.
Concrete deterioration testing equipment under multi-factor action is disscused,and the multi-factor parameters,software system,the capability of automatic date collection,the degree of automatization of operations and loading equipment were estimated.
讨论了多因素耦合作用下混凝土劣化的检测设备,对检测系统相关的多因素参数、软件系统、数据的自动采集能力、操作自动化程度、加载装置进行了评价。
6)  Micro-loading device
微加载装置
补充资料:和徐商贺卢员外赐绯(一作和徐相公贺襄阳徐
【诗文】:
云雨轩悬莺语新,一篇佳句占阳春。银黄年少偏欺酒,
金紫风流不让人。连璧座中斜日满,贯珠歌里落花频。
莫辞倒载吟归去,看欲东山又吐茵。



【注释】:



【出处】:
全唐诗:卷584-2
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条