说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 张拉施工技术
1)  tension construction technology
张拉施工技术
1.
This paper introduces the concrete pouring of continuous box girder of main structure of the bridge and the tension construction technology.
重点介绍了该桥的主桥上连续箱梁混凝土浇筑以及张拉施工技术
2)  tension construction
张拉施工
3)  construction process
施工张拉
1.
Experimental research on construction process of Levy type cable dome;
葵花型索穹顶结构的多种施工张拉方法及其试验研究
4)  stretching technology
张拉技术
1.
Combined with the examples,the paper discussed 30 m box beam stretching technology.
以 K2 8+619、2— 30 m立交桥施工为例 ,对 30 m箱梁张拉技术作一全面总
2.
During the prestressed construction of Shanghai Science & Technology Museum, the new stretching technology and computer simulation were applied to guide the construction of the over long basement exterior wall ,and the quality control was also introduced.
介绍在上海科技馆预应力施工中 ,采用新的张拉技术、计算机仿真技术指导超长地下室外墙板施工及施工中的质量控制。
5)  tensioning technique
张拉技术
1.
This paper discusses tensioning techniques of beams for prestressed concrete bridge.
对预应力混凝土桥梁张拉设备种类选择及标定方法、预应力的伸长值的测量方法以及预应力筋滑丝与断丝处理等若干张拉技术问题进行了探讨。
6)  cable stresses during construction
施工张拉力
1.
The cable stresses during construction are determined by the forward calculation method and are optimized by utilizing influence matrix and least square method with taking the influence of concrete shrinkage and creep, and geometric non linearity of the structure into account.
采用正装计算法确定斜拉桥的施工张拉力 ,利用影响矩阵和最小二乘法对斜拉桥的施工张拉力进行优化 ,并计入混凝土的收缩徐变、结构的几何非线性等因素的影响。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条