说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 施工张拉索力
1)  cables forces under construction
施工张拉索力
2)  cable stresses during construction
施工张拉力
1.
The cable stresses during construction are determined by the forward calculation method and are optimized by utilizing influence matrix and least square method with taking the influence of concrete shrinkage and creep, and geometric non linearity of the structure into account.
采用正装计算法确定斜拉桥的施工张拉力 ,利用影响矩阵和最小二乘法对斜拉桥的施工张拉力进行优化 ,并计入混凝土的收缩徐变、结构的几何非线性等因素的影响。
3)  The Initial Construction Cable Force
施工初始张拉力
4)  tension construction
张拉施工
5)  construction process
施工张拉
1.
Experimental research on construction process of Levy type cable dome;
葵花型索穹顶结构的多种施工张拉方法及其试验研究
6)  cable tension
张拉索力
1.
This paper is concerned with monitoring and control calculation、discrete model and determination of cable tension and template elevation.
主要对该桥施工监控计算的计算方法、模型离散、斜拉索张拉索力的确定和挂篮立模标高的确定进行了论述。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条