说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 一次扣拱暗挖逆作法
1.
Technology of Top-down Bored Excavation with Cast-in-situ Arch for Metro Station Construction
一次扣拱暗挖逆作法修建地铁车站新技术
2.
Technology of Three-arch Structure Subway Tunnel Construction in Sand and Gravel
砂层中三联拱暗挖地铁隧道中洞法施工技术
3.
The Application of Sallow Buried Tunneling Method in the Construction of Continuous Arch Tunnel Undergoing Railway
浅埋暗挖法在下穿公路连拱隧道施工中的应用
4.
Study on Design and Technology for Building Subway Station with Tunneling and Top-down Method;
地铁车站暗挖逆筑法设计施工技术研究
5.
Assessment of Construction Methods the Top-Down and Excavation under Cover Board Used in Harbin Subway HLJ Univ. Station;
哈地铁黑大站逆作与盖挖法评价研究
6.
Total Reverse Construction Method Construction Technology for Underground Chamber Excavation
全“逆作法”地下室挖运土方施工技术
7.
One-Time Tensioning Formation Technology of Single Steel Strand Wire of Anchor Cable of Steel Cantilever Installed Truss Arch Bridge
钢桁架拱桥悬臂安装扣索单股一次张拉施工技术
8.
CR: An Algorithm for Mining Association Rules in Reverse Order
CR:一种逆向的关联规则挖掘算法
9.
Numerical Analysis of Excavation Characters in Top-down Construction and Bottom Upheaval for Deep Excavation;
深基坑坑底回弹及逆作法开挖性状数值分析
10.
Analysis and Study on Flat Slab with Opening for Cover and Excavation Top-Down Method;
盖挖逆作法施工中预留孔洞的分析与研究
11.
Analysis on Covered Top-down Excavation Technique Adopted in Practical;
盖挖逆作法施工技术在某工程中的实践分析
12.
Construction Technique of Intermediate Pile for Subway Station with Top-Down Inverse Method
盖挖逆作法地铁车站的中间桩施工技术
13.
The techniques of topdown construction method for air shaft of metro line
地铁中间风井超深基坑明挖逆作法施工技术
14.
On the construction technique of the cover and excavation top-down method in the reconstruction project for Suzhou railway station
苏州火车站改造工程盖挖逆作法施工技术
15.
On the large-span and supporting arch key technique of PBA construction method on Qingnian avenue station
青年大街站PBA工法大跨扣拱关键技术
16.
These men work underground for 6 hours at a time,mining for coal.
这些人在地下工作一次挖煤6小时。
17.
Discussion on Calculation Method of PBA Construction Method for Mining Station under Structure-Soil Interaction
暗挖车站PBA工法结构—土共同作用下的计算方法探讨
18.
The Application of Limit Length of Cable Method in Long-Span Concrete Filled Steel Tubular Arch Bridge s Rib Assembling;
定长扣索法在大跨径钢管混凝土拱桥拱肋安装中的应用