1) string-hole
串孔
1.
The causation analysis and countermeasures of towards string-hole phenomenon during bored pile construction process
钻孔桩施工中串孔现象的原因分析及处治措施
2) string serious pore
串浆孔
1.
Combined with the grouting engineering practice of Huiyang Shatian reservoir,the grouting material problems,serous diffusion radius problems,stability of filled type grouting technology and string serious pore problems were analyzed,so as to enhance the reservoir dam base grouting design level and guarantee the reservoir dam base grouting quality.
结合惠阳沙田水库灌浆工程实践,对灌浆过程中遇到的灌浆材料问题、浆液扩散半径问题、充填式灌浆耐久性问题及串浆孔问题进行了分析,以提高水库坝基灌浆设计水平,确保水库坝基的灌浆质量。
3) porosity cluster pore
成串孔洞
4) large nozzle-to-cylinder diameter ratio
大开孔串
5) series port
串接孔口
6) lacinghole
纹板串连孔
补充资料:第二孔(继发孔)型缺损
第二孔(继发孔)型缺损
ostium secondary defect
是心房间隔在形成上发生障碍,一般缺损较大,多在卵圆孔附近称第二孔(继发孔)型缺损。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条