说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 时间载荷历程
1)  time-load history
时间载荷历程
1.
Combining the powerful interface development capabilities of C# with the powerful numerical computation and graphics display of MATLAB,a simple and effective data-processing software for processing the time-load history which got from dynamics calculation thus to combine the dynamics and strength calculation closely has been developed.
将C#强大的界面开发能力与MATLAB强大的数值计算和图形显示能力相结合,开发了适合于处理动力学计算所得时间载荷历程文件从而实现动力学计算和强度计算"无缝"结合的一个简单有效的数据处理软件。
2)  time history of loads
载荷时间历程
3)  load history
载荷历程
1.
The effective load history is constructed by the algorithm of the unfixed level difference and it is credible guarantee to analysis the fatigue damage life later.
本文以NICompactRIO技术为核心设计了机载应变测试系统,给出了在应变测试中消除长线传输误差的方法,并采用基于变级差有效载荷历程构建算法实现了有效载荷历程的构建,为后续疲劳损伤分析提供了可靠的保证。
2.
High temperature fatigue creep test of 316L stainless steel under 1-step and 2-step load was conducted,the influence of the load history on material behavior was investigated emphatically.
进行316L不锈钢在单级和两级载荷作用下的高温疲劳蠕变试验,研究了载荷历程效应对材料行为的影响。
4)  variable load history
变载荷历程
1.
Cruciform welds were fatigue tested under constant amplitude axial load and variable load history conditions.
对十字接头分别进行恒幅轴向载荷和变载荷历程疲劳试验,接头疲劳裂纹通常开始发生在焊缝根部,但如果接头变形引起的弯曲应力较大,疲劳裂纹也可能发生在焊缝趾部。
5)  duration of load,loading time
载荷时间
6)  load time history
荷载时程
补充资料:时间

实际上,时间单位首先从天文观测来确定的,“1平太阳日或1天(1昼夜)”是以地球相对于太阳的自转周期为基准来计量的,一个平太阳日的1/86400为1秒;后来发现地球自转不均匀,1960年国际度量衡大会把时间基准改为以地球绕太阳公转周期,即规定为1900年地球公转周期(回归年)的1/31556925.9747为1秒;随着精确、稳定的原子钟制成,1967年国际度量衡大会规定国际单位制原子时的时间单位“秒(长)是两个超精细能级之间跃进所对应辐射9192631770个周期的持续时间”。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条