说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 多点锚固
1)  multi-anchorage
多点锚固
2)  anchoring joint
锚固节点
1.
This paper introduces the experimental study on the model test of anchoring joint of stay cable used in Nanjing railway station, including the finite element analysis, the design of the test installation, the test results analysis, etc.
较详细地介绍了南京站主站房斜拉索锚固节点的试验过程 ,包括有限元计算、试验装置设计、试验结果分析等。
2.
This paper introduces the experimental process on the model test of anchoring joints of stay cables used in the main stadium of Dragon Sports Center in Zhejinang Province,including the design and manufacture of the model,loading method ,measurements,etc.
本文概要介绍了浙江省黄龙体育中心主体育场斜拉索锚固节点模型试验的全过程,包括模型的设计、制作、加载、量测等方面。
3)  joint anchorage
节点锚固
4)  setting an anchor point
预设锚固点
5)  pointan-chored circular ring
点锚固圆环
6)  multi-anchor wire
多点锚拉索
补充资料:锚固


锚固
anchor

  mO0gU锚固(a nchor)采用锚杆或锚索对边坡进行加固的作业。在边坡上钻孔穿过潜在滑面,插人锚杆或锚索,在锚固端注浆后对锚杆(索)预加拉应力,最后在坡面上锁紧锚头。其作用原理是借助锚固段砂浆与孔壁周围岩体的摩擦阻力,将锚杆(索)的应力传递到潜在滑动面以下的深部岩体中,增高滑体对滑面上的正应力,从而提高抗滑阻力,使锚杆(索)锚固端两端部之间形成压力锥体范围内的岩石被挤压,进而使潜在滑动面上下的岩石与锚杆(索)联成一个整体,形成一均匀挤压带,约束了岩体的变形和破坏,提高了坡体的稳定性。其作用原理见图l。 对于平面型滑坡锚杆(索)加固作用(图2)以公式表达: 加固前K,一昼塑竺决李型兰卫二 。。二n:‘”Gsin口 二.二。。_[Geosa+Psin(a+6)〕tan笋+CL 加固后K:二匕=共一舟井拱子拼井罕拱裂止二 ““目,“一’‘Gsinq一尸cos(口十6)式中分子表示抗滑力;分母表示滑动力;Kl、K:分别为加固前后边坡稳定性系数;G为滑坡体重量四为滑动面倾角;0为预应力锚杆(索)与水平面的夹角;尹为岩石的内摩擦角;C为岩石粘结力;L为条块滑面长度;尸为锚杆〔索)每沿米的预拉力。 预应力锚杆(索)主要适用于岩体整体性较好且具有确定的潜在滑动面的岩质边坡。笋 图1锚杆(索)作用原理示意图 王一压缩带;2一猫杆(索);3一未加固的表面岩石; 4一锚头;5一滑动面;6一锚固段 、尸少汀 G 图2锚固力尸的作用图
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条