2) IT project planning
IT项目进度计划方法
1.
A multiple-phase optimization method for IT project planning is presented to meet the uncertainty of IT project process and dynamic of project resources.
本文针对IT项目实施过程的不确定性和项目资源的动态性,提出了一种基于分阶段求优的IT项目进度计划方法。
3) Programme Evaluation and Review Technique [PERT]
计划进度评审法
4) schedule plan
进度计划
1.
Research of Schedule Plan and Schedule Control of Fire System of Jingshui Building;
晶水大厦消防工程项目进度计划与控制研究
2.
This article expounds the making of schedule plan and schedule control according to the practical application of P3 in Zhuzhou Navigation Lock project,so as to reveal to the engineering administrators the application method of P3 and main ideas and methods of engineering project administration reflected by P3.
结合P3在株洲船闸工程项目的应用,对进度计划的编制及进度控制作简要叙述,旨在使各级工程管理人员了解如何应用P3,了解P3所反映的工程项目管理的主要思想及方法。
3.
Project network technique is presently a frequently-used method to make project schedule plan.
目前,工程项目进度计划的编制多采用网络计划方法。
5) schedule
[英]['ʃedju:l] [美]['skɛdʒul]
进度计划
1.
we are aiming at establishing a more practical and visible schedule control chart based on Bar Chart and CPM.
通过对影响工程进度的约束事件的分析,在横道图和关键线路网络图(CPM)的基础上,力图建立一种施工现场实用直观的进度计划控制图技术。
2.
How to schedule highway engineering while considering influence of random factors was discussed,then,a new project planning technique considering effect of random factors was presented which classified those random factors and constructed different models to deal with different kinds of random factors using computer simulation technology and program evaluation and review technique(PERT).
对在编制公路工程进度计划时如何考虑气候等随机因素的影响进行了研究,提出了考虑气候等随机因素影响的公路工程动态网络计划方法。
3.
Case study shows that the present method may help to obtain reliable work schedule for projects and the earliest time for each node.
针对给定施工进度风险水平的施工进度计划编制问题,采用当量概率和蒙特卡罗仿真技术,给出了基于一定施工进度风险水平的施工进度计划的编制步骤;运用Delphi7。
6) progress schedule
进度计划
1.
The working out and adjustment of construction progress schedule are researched in accordance with the construction management practice of Dongping hydroproject.
结合洞坪工程建设管理的实际,就施工过程中的进度计划制定及调整做了分析与研究。
2.
In th e construction and management of the project, we should pay great attention to t he progress control and should formulate detailed progress schedule, effectively trace the construction process, timely analyzes the construction progress and p roperly make some adjustment,in order to ensure the smooth completion of Jinhe H ydropower Project in schedule.
在电站建设管理中,要高度重视进度的管理,应做到制定详细的进度计划;进行有效的过程跟踪;及时分析进度并调整等,以确保金河电站按计划进度顺利完成。
补充资料:矿山采掘进度计划编制的计算机方法
矿山采掘进度计划编制的计算机方法
computerized method for the production scheduling in mine
kuongshon ea.Juej一ndu Jlhuo blanzh一deJ一suonJ一fongfa矿山采掘进度计划编制的计算机方法(com-puterized znethod for the produetion sehedulingin mines)用电子计算机和优化数学方法来编制矿山采掘进度计划。用这种方法既能获得最大效益,又能满足给定的采矿技术经济条件。所编制的采掘进度计划可以是长期的,也可以是年、季、月,或更短时期的。 编制采掘进度计划是矿业中应用计算机较早和较广泛的领域。20世纪60年代世界各国就开始研究用计算机编制矿山采掘进度计划.到70年代已广泛应用中国于70年代末开始研究,80年代开始在生产中应用。 计算机编制采掘进度计划所需要的基础信息有:矿床地质模型和经济模型(见矿床模型);计划期间的开采任务指标、各种定额指标;要考虑的技术经济条件;规划期间可供开采的范围。常用的数学模型有线性规划法、整数规划法、非线性规划法、动态规划法、系统模拟法和CAD法(见矿山计算机辅助设计)。 线性规划性建立线性规划模型,解算出规划期间的最优计划。 假设有、个出矿点,求解计划期间各出矿点的出矿计划量、J,达到总利润Z最大的目标。已知各出矿点J(j~1,2,……,、)的矿石品位为a」,第k种有害物质的含量为风(有害物质共m种,k一1,2,…,m),单位矿石产量销售后的利润为‘。要求满足的条件是:各出矿点的计划出矿量不得超过该出矿点的矿石储量Q或出矿能力A。;采出矿石平均品位的上下限分别为a。和口:;各有害物质平均含量的上限为月k;计划期间任务出矿量为Q。由此可以写出线性规划模型: ma、z一乙、二 J一1 5 .t.艺二妻Q j一二 二毛A,了一l,2,…,,, 二」蕊Q,,少=l,2,…,,, 艺a」几 a。)二上一妻a, 艺毛 )一l扒帅匆节一 乙风了}方法的实质是: 一毛召k.胜1.2,…,脚门)按时间或空间将整个规划过程划分成、个阶 艺二段(时间或空问)·用变量汤表示所处的阶段.、一、1.…拼…一{的电铲台班数,矿石总产量与精矿总产量的上下限,分策略·并产生效益序列·认(‘。·“、).z(了;,111)..一:,到七。一丁,.从、.;二六卜如声休。*二、。八、日「,二。(不、·“小协一(、印,,“寿一卜)..…:,。(‘石、·“。)决策序列中别为“·‘;八兰:。