1.
A Technology Based on Critical Chain for Project Scheduling;
一种基于关键链的项目进度计划方法
2.
IT Project Planning Based on Multiple-phase Optimization;
基于分阶段求优的IT项目进度计划方法
3.
IT Project Planning Method Based on Markov Decision Process;
基于马尔可夫决策过程的IT项目进度计划方法
4.
Research on the Method of Task Decomposition and Critical Chain Scheduling for Collaborative Manufacturing;
协作制造项目任务分解与关键链进度计划方法研究
5.
Study on the Method of Data Warehouse Project Schedule Development;
数据仓库项目进度计划编制方法研究
6.
Improvement in the calculating method on "the Average Degree of Performing a Project;
关于“平均计划完成程度”计算方法的改进
7.
The Installation Schedule and Optimization Method for Mechanical and Electrical Equipment of Hydro Power Station
水电站机电设备安装施工进度计划及优化方法
8.
There is a comparative method of Gantt chart among progress-actual vs schemed method which is applied to construction progress control management.
在工程项目进度控制管理中,有一种实际进度与计划进度比较的方法是横道图比较法.
9.
a production schedule
生产进度[计划]表
10.
The Study on Schedule Plan and Control Method of Shan County Fuel Power Plant Based on PMC Model;
基于PMC模式的单县生物电厂工程进度计划与控制方法研究
11.
Study on Schedule Risk Analysis in the Engineering Project Network Planning and Critical Chain Scheduling;
工程网络计划进度风险分析及关键链进度计划法研究
12.
The Study of Method of Planning and Scheduling for FMS Based on the Genetic Algorithm;
基于遗传算法的FMS计划调度方法研究
13.
Improvement of lead time in MRP;
物料需求计划提前期设置的改进方法
14.
An Improved Capacity Requirements Planning Method for MRPⅡ/ERP Systems;
MRPⅡ/ERP能力计划的一种改进方法
15.
Critical chain -- A new method for project planning and scheduling;
关键链——一种项目计划与调度新方法
16.
Research on Methods of Making Monthly Power Trade Schedule for Generation Units
发电单元月度电能计划编制方法研究
17.
Research on Improvement to Partitioning Clustering Algorithm and Density-based Clustering Algorithm;
划分聚类与基于密度聚类算法的改进方法研究
18.
Design Method of ATO in Air Offensive Campaign Simulation
空中进攻作战模拟出动计划设计方法研究