1) large-scale building of water conservancy projects
大兴水利
2) launch a large-scale [extensive] water conservancy project
大规模兴修水利
3) constant storage level
兴利水位
1.
Considering the characteristics of seasonal storage and freezing in winter time,the immersion scope of this reservoir is determined by the raising period of ground water table and the dynamic observable field data under the constant storage level.
对双阳河水库浸没范围确定,不是根据水位壅高,通过理论计算得出,而是根据该水库的季节性蓄水及冬季冻结特点,在兴利水位条件下,地下水壅高时间可确定性和动态观测数据来确定。
4) building irrigation projects
兴修水利
1.
The Relief Policies of Donghan consist of emergency strategies centered by aiding victims after disasters and loaning victims state lands,and longterm strategies centered by building irrigation projects and warehouse constructions.
东汉赈灾政策 ,有以灾后赈济及假民公田为中心的紧急对策和以兴修水利及仓储建设为主要内容的长期对策。
5) Italian Renaissance
意大利文艺复兴
1.
The period of the Italian Renaissance is one of the most important periods in the western history.
意大利文艺复兴时期在西方历史上是重要的一页,因为这时期辉煌的艺术成就而为世人所瞩目。
2.
Italian Renaissance generated a new conception of art and artistic practice.
意大利文艺复兴运动创造了一种新的艺术观念和实践,由于法国和意大利在历史地理和文化方面的相近性,意大利文艺复兴的美术观念对法国的美学实践产生了强大的影响。
补充资料:水库兴利下限水位
水库兴利下限水位
lowest water level of reservoir for beneficial use
shuiku xingli xiaxian shuiwei水库兴利T限水位(lowest water leVelof reservoir for benefieial use)水库在正常兴利运用情况下允许消落到的最低水位,它反映兴利需要及各方面的控制条件,这些条件包括泄水设备高程、水电站的最小工作水头、库内渔业生产、水源保护及其他要求等。 确定兴利下限水位的主要依据是原设计死水位。在水库设计中,死水位(亦称设计低水位、垫底水位)要根据灌溉、航运、发电、渔业及水源保护等方面的要求及水工结构条件等进行综合比较及经济分析选定(见水库工程规划)。在水库运行中,制定当年的调度运用计划时,应根据原设计死水位及当时各方面的要求和预报来水情况,经过论证比较后确定兴利下限水位。在一般情况下,兴利下限水位应不低于原设计死水位。具体确定时,还要考虑以下情况:①对于多年调节水库(见径流调节),为预防可能发生连续枯水情况,水库在正常年份应留有一部分储备水量,故在年初蓄水较高时,拟定的当年兴利下限水位应较多地高于原设计死水位;②当水库承担的水利任务较原设计发生变化,对兴利下限水位有新的要求时,应考虑这些要求;③对于年调节发电水库,如经过论证在一般年份控制较高的年消落水位对发电有利时,兴利下限水位也可以高于设计死水位。 在实际运用中,应根据水库调度图长计划短安排,注意掌握水库的消落,不使库水位降至兴利下限水位以下。当水库水位已接近兴利下限水位时,应及早减少供水,以免在来水较枯时后期更加紧张。当遇到特枯水年份,水库被迫在兴利下限水位以下运用时,要考虑保证重点用水单位的最低需要、水电站引水建筑物及机械设备的安全运行以及库区渔业生产和水源保护的最低要求。(谭培伦蒋光明)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条