Having an ethylene plant with an annual production of 300,000 ton, a company used to be equipped with two start-up boilers (U-BF1201A/B), as the company has revamped the plant and enlarged its production capacity to 450,000 ton without increasing the number of start-up boilers, the steam balance is becoming an acute problem.
某公司年产30万吨乙烯装置配备了两台开工锅炉(位号为U-BF1201A/B),随着该公司年产45万吨乙烯装置改扩建的建成投产,因没有增加开工锅炉,蒸汽平衡问题尤为突出。
2.
Adjustment measures to solve the problem of high energy cost as the start-up boiler not stopping normally is given.
简要介绍了川西北气矿甲醇厂工艺路线、蒸汽及蒸汽发生系统流程 ,针对工厂试生产过程中出现的蒸汽不平衡的原因进行了分析并提出相应的工艺调整措施 ,解决了开工锅炉无法正常停运而引起能耗超高的矛盾。
4) drinking water boiler
开水锅炉
6) a leak in the Boiler
锅炉的裂隙
补充资料:发包人要求承包人按时开工和按要求施工的权利
发包人要求承包人按时开工和按要求施工的权利:承包人应当按照合同的约定做好开工前的准备工作,负责作好施工场地的平整,施工界区内用水、用电、道路、以及临时设施的施工:编制施工组织设计或施工方案;按照约定作好材料和设备的采购、供应和管理;向发包人提供应由发包人供应的材料、设备的计划,承包人应按照合同约定的开工日期按时开工。在施工中,承包人须严格按照施工图及说明书进行施工,承包人不按照施工图和说明书施工而造成工程质量不符合合同约定条件的,应当负责无偿修理或者返工。《民法》第一版 第515页 魏振瀛 北京大学出版社
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条