1) Qunying Dam
群英坝
2) spurgroup
群坝
1.
Based on the experimental study of single spur,the scour occuring around spurgroups is discussed.
在单坝试验研究的基础上对群坝局部冲刷问题进行了偿试性的试验研究,根据两坝试验资料,分析了群坝冲刷特性与单坝冲刷特性的区别以及坝长、间距、水流、泥沙条件对群坝中各坝冲深的影响,并且提出了冲深计算方法。
3) low dams
低坝群
4) spur-dikes
丁坝群
1.
Based on the difference equations for 2-D depth-averaged current,the 2-D mathematical model with spur-dikes is proposed,which is solved by finite element method using Galerkin method of weighted residuals and Newton-Raphson non-linear iteration.
将模型应用到河龙高速清溪河段水毁防护工程,对丁坝群护岸进行了模拟分析,结果表明,该模型在丁坝群护岸工程的水流模拟中具有推广价值。
5) dam group
大坝群
1.
In order to monitor behavior of dam group,remote and real-time monitoring warning system of dam group is realized by use of modern technology of Internet and communication.
为及时掌握大坝运行性态,采用现代网络、通信技术,开发大坝群自动监控报警系统,实现对大坝群安全远程实时监控。
2.
In order to fully utilize the rapid increasing abundant monitoring data of dam group and to provide the stronger decision-making support fordam safety monitoring, data warehouse is discussedas the baseplatformand the new-style decision-making systemwith the functions of management and decision-makingfordam groupis developed.
为充分利用大坝群迅速增长的海量监测数据,对大坝安全监控提供更强的决策支持,探讨以数据仓库作为基础分析平台,开发具有管理决策功能的新型大坝群决策系统。
3.
In order to solve the existing problem of distributed management of dams, modern technology of Internet and communication is used for the realization of remote, online and real-time monitoring of dam groups.
为了克服大坝分散式管理中存在的问题,采用现代网络、通信技术开发大坝群监控信息管理系统,实现大坝群远程在线实时监控。
6) reserviors
库坝群
1.
The discussion on reserviors controlling in Qixinghe river valley;
七星河流域库坝群的治理探讨
补充资料:群英坝
群英坝 世界最高的浆砌石重力拱坝。位于中国河南省焦作市郊大沙河峡谷中。以灌溉为主,兼有发电 、防洪和养鱼等综合效益。控制流域面积165平方千米,水库总库容2000万立方米。坝址处河谷断面呈V形,基岩以灰岩为主。最大坝高100.5米 ,顶宽4.5米,底宽52米,坝顶弧长154.28米。坝体上游面及近坝基部分采用100号混凝土防渗体,坝体采用100号小石子砂浆砌块石,坝体总体积19.2万立方米。溢流坝段设在坝中部,分7孔,无闸门控制,最大泄量4300立方米/秒。溢流面采用钢筋混凝土护面板。消能工采用高鼻坎挑流。该坝于1966年11月开工,1971年7月建成。
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条