1) Kagoshima Power Plant
鹿儿岛电厂
3) Kagoshima Shinko
鹿儿岛新港
4) Kagoshima Shigeharu
鹿儿岛重治
5) isolated plant
孤岛电厂
1.
How to rapidly recover the power network connection between isolated networks and connect system of isolated plant again? It is the problem that must be taken into account for secure operation of power grid.
电力系统发生特大事故可能导致电网解体为数个孤网,并使一些发电厂断掉了和系统的联系成为孤岛,如何迅速恢复孤网间的联网及孤岛电厂的快速再入网,是电网安全运行必须考虑的问题,也是被瓦解的电力系统有效实施黑启动所必须面对的现实。
6) Huangdao power plant
黄岛电厂
1.
Calculation of thermal environmental capacity of sea around Huangdao Power Plant
黄岛电厂附近海域热环境容量计算
2.
In this paper,a two-dimensional mathematical model of tidal current and sediment with irregular triangular grids is used to make numerical simulations of tidal current field and sediment field in the Huangdao power plant water intake sea area,and the sediment siltation strength in the power plant water intake area is computed.
建立了基于不规则三角形网格的考虑波浪及其破碎作用的二维潮流场和泥沙场数学模型,对黄岛电厂取水海域的潮流场、泥沙场进行了数值模拟和分析,对电厂取水口的泥淤积强度进行了计算。
补充资料:鹿儿岛电厂
鹿儿岛电厂 Kagoshima Power Plant 世界最大火电厂。位于日本茨城县鹿儿岛临海工业区,与鹿儿岛炼油厂相邻。全厂装机容量440万千瓦(kW),共6台超临界压力机组,其中4台60万kW ,2台100万kW。全部燃油。第一台机组1968年投运,1975年全部建成。电厂自动控制水平较高,全厂职工仅200余人,实行4班运行。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条