1.
Abnormal Vibration Diagnosis and Treatment of Unit 660 MW Exciter Rotor in Huangdao Power Plant
黄岛电厂660MW机组励磁转轴异常振动的诊断及处理
2.
Credit Risk Assessment and Project Appraisal for 2X600MW Huangdao Power Plant Expansion Project Phrase Ⅲ
黄岛发电厂三期2X600MW扩建工程项目贷款风险评估
3.
The TMI plant was duly constructed.
三哩岛核电厂按时批准兴建。
4.
The Economy Evaluation of the Extension Engineering of the Providing Generating Sets of North China Electric;
华电青岛电厂供热机组扩建项目经济性评价
5.
GUOHUA HUANGHUA POWER PLANT MAIN WORKSHOP BUILDING PROJECT PHASE Ⅱ IN HEBEI PROVINCE
河北国华黄骅发电厂主厂房二期工程深化设计
6.
Flood Prevention Dispatching Decision Support System in Huang Longtan Hydro Power Station
黄龙滩电厂防洪调度决策支持系统
7.
Debugging Experiment of 670t/h Pulverized Fired Boiler in Huanggezhuang Power Plant;
黄桷庄电厂670t/h煤粉炉调试试验研究
8.
Research on the Knowledge Base on Huanghua Power Plant 600MW Air-cooled Unit;
黄骅电厂600MW空冷机组知识库研究
9.
Modeling of 170MW Unit Governor System of Huanglongtan Hydropower Plant
黄龙滩水电厂170MW机组调速系统建模
10.
Application of Collapsible Loess Foundation Processing in Thermal Power Plant
湿陷性黄土地基在火力发电厂的应用
11.
Design rules for mechanical components of pwr nuclear islemds
GB/T16702-1996压水堆核电厂核岛机械设备设计规范
12.
Research of Operational Parameter Performance Evaluation System of 300MW Unit of Qin Huangdao Power Plant;
秦皇岛电厂300MW机组运行参数考核系统的研究
13.
The Research and Improvement of DC System s Reliability in Qingdao Power Plant;
青岛电厂直流系统可靠性的研究与改进
14.
Experimental Investigation on Thermal Flow Field Characteristics of a Direct Air-cooled System for a Large Power Plant
发电厂直接空冷系统空冷岛热态流场特性分析
15.
Electricity for HEC's supply areas is supplied from the Lamma Power Station.
在港灯负责供电的地区,电力由南丫岛发电厂供应。
16.
ABNORMAL VARIATIONS OF GEOELECTRICITY IN QINGDAO REGION IMMEDIATELY OCCURRED PRIOR TO THE EARTHQUAKE (M 5. 3) IN THE NORTH OF SOUTH YELLOW SEA
南黄海北部5.3级地震前青岛地电的短临异常
17.
At the end of 1998, total installed capacity at the Lamma Power Station was 3 305MW.
一九九八年底,南丫岛发电厂的总发电量为3305兆瓦。
18.
Casablanca was made in the golden age of the studio system.
卡萨布兰卡》是片厂制度黄金时期的电影。