Three contents are included which are: the combination of chimera grid technique and matching grid technique,the turbulence model which is suitable for the flow field with complicated configuration,and the boundary condition of jet flow with or without inner flow.
主要讨论了能灵活处理复杂外形的重叠-搭接网格技术;适于低速大迎角流动及重叠-搭接网格技术的湍流模型以及是否考虑内流的喷流边界条件的定义。
5) overlapping network
搭接网络
1.
A Method Study for Overlapping Network s Optimization under Multi-goal and Multiple Resource-constrained Conditions;
搭接网络计划的多目标多资源模糊优化的研究
2.
This article discussed the problems about using fuzzy optimum for multiple resource-constrained in overlapping network,to determine the roles of the difference resources by fuzzy algorithm theory,then we treatments resources by quasi-shared method,and we will final solution this question about multiple resource-constrained in overlapping network.
针对工期固定情况下搭接网络中的多资源优化问题,运用模糊优选理论确定各种资源的重要性,进而对其进行同一化处理,最终解决搭接网络的多资源优化问题。
6) spliced network
搭接网络
1.
In this paper, the calculating models and chart models for spliced network planning are analyzed in a systematic way.
对搭接网络计划的计算模型和图示模型进行了较系统的分析 ,引入了延迟工序和增广网络计划的概念 ,基于这些概念 ,讨论了搭接网络计划时间参数的计算模型和双代号搭接时标网络图的生成与判读方
2.
In this paper, a set of unified calculating models for general network planning, spliced network planning and streamlined network planning based on analysis of the spliced network planning.
基于对搭接网络计划的分析 ,给出一组一般网络计划、搭接网络计划和流水网络计划的通用时间参数计算模型 。
3.
The study of time-cost optimization is extended from the traditional CPM network to spliced network.
本文在研究实际问题的基础上将时间-费用优化问题由传统的CPM网络推广到更为符合实际的搭接网络中,提出搭接网络中的时间-费用优化问题。