说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 搭接PERT网络
1)  spliced PERT network
搭接PERT网络
2)  overlapping network
搭接网络
1.
A Method Study for Overlapping Network s Optimization under Multi-goal and Multiple Resource-constrained Conditions;
搭接网络计划的多目标多资源模糊优化的研究
2.
This article discussed the problems about using fuzzy optimum for multiple resource-constrained in overlapping network,to determine the roles of the difference resources by fuzzy algorithm theory,then we treatments resources by quasi-shared method,and we will final solution this question about multiple resource-constrained in overlapping network.
针对工期固定情况下搭接网络中的多资源优化问题,运用模糊优选理论确定各种资源的重要性,进而对其进行同一化处理,最终解决搭接网络的多资源优化问题。
3)  spliced network
搭接网络
1.
In this paper, the calculating models and chart models for spliced network planning are analyzed in a systematic way.
对搭接网络计划的计算模型和图示模型进行了较系统的分析 ,引入了延迟工序和增广网络计划的概念 ,基于这些概念 ,讨论了搭接网络计划时间参数的计算模型和双代号搭接时标网络图的生成与判读方
2.
In this paper, a set of unified calculating models for general network planning, spliced network planning and streamlined network planning based on analysis of the spliced network planning.
基于对搭接网络计划的分析 ,给出一组一般网络计划、搭接网络计划和流水网络计划的通用时间参数计算模型 。
3.
The study of time-cost optimization is extended from the traditional CPM network to spliced network.
本文在研究实际问题的基础上将时间-费用优化问题由传统的CPM网络推广到更为符合实际的搭接网络中,提出搭接网络中的时间-费用优化问题。
4)  PERT network
PERT网络
1.
Research of random simulation in PERT network based on Excel;
Excel环境下PERT网络的随机模拟研究
2.
There may be more than one critical path and sub critical paths in a PERT network.
为解决PERT网络中可能有多于一条关键线路或次关键线路时 ,在特定计划工期下对工程完工概率的影响问题 ,从分析进度网络结构入手 ,在分清这些线路是相关的还是相互独立线路的基础上 ,针对各种情况 ,给出分析计算方法与算例 。
3.
This text has introduce the concept of the project management, has described that develops the relevant reasons to fail in project, explain and prove how to set up and use PERT network in detail.
本文介绍了项目管理的概念,描述了项目开发失败的相关原因,详细阐述并论证如何建立和使用PERT网络。
5)  PERT network model
PERT网络模型
1.
It proposes to use PERT network model to manage process and puts forward the proposal about the management process method matters needing attention.
本文针对农业科技专家大院草科鸡规模养殖项目运行和管理中存在的问题,就优化农业科技项目管理与提高项目运行的效用和功能,提出采用PERT网络模型管理农业科技项目的思路,并对项目管理过程、方法及注意事项等问题提出了建议。
6)  PERT Network Plan
PERT网络计划
补充资料:黏合搭接接头
分子式:
CAS号:

性质:两个被粘物部分叠合粘接在一起形成的接头。搭接比对接形式抗剪强度高,而且可靠,是一种十分普遍使用的粘接形式。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条