1) top spring mount
上端簧安装
3) spring installer
弹簧安装器
4) ultrasion vibration sysytem
安装端面
5) face mounting
端面安装
6) offshore installation
海上安装
1.
Special attention should been paid to the requirement from the drilling and completion works during the engineering, fabrication and offshore installation of platforms, single point mooring system, subsea pipeline as well as drilling and completion is extremely important.
在平台、单点系泊、海底管道和电缆的设计、建造和海上安装过程中,需要特别重视钻完井作业的要求。
2.
The platform was installed by lifting instead of conventional launch method, which significantly improved the offshore installation efficiency.
在中国海洋石油总公司平湖工程项目组的组织管理下,海上安装承包商HEEREMA成功地完成了海上安装工作。
3.
This article introduces briefly the application,compositive innovation,offshore installation and project management of module drilling rig in Chinese offshore oil fixed platform and gives some advices to Chinese homemade module drilling rig s development.
介绍了我国海上固定式平台模块钻机的应用、集成创新、海上安装和项目管理等,对我国海上固定式平台模块钻机的国产化提出了建议。
补充资料:上端
1.上部;顶端。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条