1) pour-over method
置冲法
2) vibro-replacement process
振冲置换法
1.
18 section, t hi s paper sums up construction methods of soft foundation solidification, emphatic ally introduces vibro-replacement process.
结合渝怀铁路十八标段的实际情况,对加固软弱路基的施工方法进行了总结,着重对振冲置换法进行了说明。
3) pulsed biasing
脉冲偏置法
4) open ladle method
浇桶置冲法
5) Buffer Replacement Algorithm
缓冲区置换算法
6) vibro-floatation combined with dynamic compaction
振冲置换加强夯法
1.
,pressing construction period and complicated land formation scheme,vibro-floatation combined with dynamic compaction,vacuum combined with surcharge preloading,and dynamic compaction were adopted for the ground under the storage yard;and precast piles and dynamic compaction with cone hammers were applied for the ground under the rail bearer of gantry crane.
针对大连港大窑湾港区三期工程工期紧、陆域形成方式较为复杂的工程特点,堆场区分别采用了振冲置换加强夯法、真空联合堆载预压法和强夯法进行地基处理,而场桥轨道梁区采用了预制桩、锥型锤强夯等地基处理设计方案,可为类似工程设计提供参考。
补充资料:振冲法
通过振冲器产生水平方向振动力,振挤填料及周围土体,达到提高地基承载力、减少沉降量、增加地基稳定性、提高抗地震液化能力的地基处理方法。
振冲器的上部为潜水电机,下部为振动体。电机转动时通过弹性联轴节带动振动体的中空轴旋转,轴上装有偏心块,以产生水平向振动力。在中空轴内装有射水管,水压可达0.4~0.6兆帕。依靠振动和管底射水将振冲器沉至所需深度,然后边提振冲器边填砂砾边振动,直到挤密填料及周围土体(振冲过程如图示)。振冲法施工时除振冲器外,尚需行走式起吊装置,泵送输水系统、控制操纵台等设备。
德国在20世纪30年代首先用此法振密砂土地基。近年来已用于粘性土中。在饱和粘土的振冲孔中填以碎石,经振密形成石柱的方法(又称石柱法),主要起置换作用。由此形成的地基应按复合地基计算。
振冲器的上部为潜水电机,下部为振动体。电机转动时通过弹性联轴节带动振动体的中空轴旋转,轴上装有偏心块,以产生水平向振动力。在中空轴内装有射水管,水压可达0.4~0.6兆帕。依靠振动和管底射水将振冲器沉至所需深度,然后边提振冲器边填砂砾边振动,直到挤密填料及周围土体(振冲过程如图示)。振冲法施工时除振冲器外,尚需行走式起吊装置,泵送输水系统、控制操纵台等设备。
德国在20世纪30年代首先用此法振密砂土地基。近年来已用于粘性土中。在饱和粘土的振冲孔中填以碎石,经振密形成石柱的方法(又称石柱法),主要起置换作用。由此形成的地基应按复合地基计算。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条