1) fuel element failure accident
燃料元件破碎事故
2) element break-down accident
元件破损事故
3) fuel-element scrap
燃料元件碎屑
4) fuel crushing
燃料破碎
1.
The problems in fuel crushing system of 320 m2 sintering machine during the initial production stage at Jigang and the solving methods are introduced.
介绍了济钢320 m2烧结机燃料破碎系统投产初期遇到的问题以及解决方法。
补充资料:核燃料储运(见乏燃料贮存与运输)
核燃料储运(见乏燃料贮存与运输)
nuclear fuel transport and storage:see spent nuclear fuel trasport and storage
核燃料储运(nuelearfuel transport andstorage)核燃料的储存和运输都有严格的防辐射要求。见乏燃料贮存与运输。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条