1) fuel primary crushing
燃料预破碎
1.
Pointed at the non ideal size composition of fuel in ANGANG sintering plant, the test of fuel primary crushing with quardroll crusher was conducted, and the feasibility of using quardroll crusher as primary crusher was proved The production application shows that the size eligible rate of coal fine was increased greatl
为了解决安钢烧结厂燃料粒度不理想的问题 ,对使用四辊破碎机进行燃料预破碎进行了试验 ,证明了预破碎设备选用四辊破碎机的可行性。
2) fuel crushing
燃料破碎
1.
The problems in fuel crushing system of 320 m2 sintering machine during the initial production stage at Jigang and the solving methods are introduced.
介绍了济钢320 m2烧结机燃料破碎系统投产初期遇到的问题以及解决方法。
3) prebreaker feeder
预破碎进料器
4) fuel element failure accident
燃料元件破碎事故
5) prebreaker
[pri:'bri:kə]
预破碎机
6) primary crushing
预破碎
补充资料:核燃料储运(见乏燃料贮存与运输)
核燃料储运(见乏燃料贮存与运输)
nuclear fuel transport and storage:see spent nuclear fuel trasport and storage
核燃料储运(nuelearfuel transport andstorage)核燃料的储存和运输都有严格的防辐射要求。见乏燃料贮存与运输。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条