1) Initial charges
首期费用
3) Initial listing fee
首期上市费
4) expected cost
期望费用
1.
Assume that working procedure is only cutting tool′s breakdown,by using the method of probability and the theory of renew process,mathematic model that expected cost per unit time is objective function has been established,we take the interval of check and replacement of cutting tools as policy,the problem is to determine the o.
将定期检测和将刀具更换作用于同一工序流程,在只考虑刀具故障条件下,通过概率论和更新过程理论建立了以单位时间内期望费用为目标函数的数学模型,以检测间隔和刀具更换间隔为策略,确定最优的策略使得目标函数达到最小,并求出了经长期运行单位时间内期望费用的明显表达式。
2.
Current textbooks only discuss the condition under which the optimal quantity ordered should satisfies and do not give the concrete formulas for expected cost,which is an inconvenience for real practical uses.
目前很多运筹学和管理科学教科书一般只给出报童问题最优订购量应该满足的条件,而没有给出具体的期望费用的表达式,这对于报童问题模型在实际中的应用造成不便。
5) components of expenditure
费用预期
6) time-cost
工期-费用
1.
For solving time-cost optimization problems of PERT(Program Evaluation and Review Technique) network plans,the model was represented with linear programming,and a particle swarm optimization algorithm was used to solve this problem.
针对工程项目PERT网络计划工期-费用优化问题,尝试引入粒子群算法。
2.
Based on analysis of uncertainties in both project completion limit and expense in project negotiation scheduling of virtual enterprise, a multi-issue time-cost stochastic model was put forward.
在分析虚拟企业项目协商规划的工期与费用的不确定性的基础上,提出了多属性工期-费用随机项目模型,以及工期-费用部分并行协商规划算法,以期望工期费用为优化目标,结合示例阐述其计算过程。
补充资料:全期缴保险费
全期缴保险费
【全期缴保险费】采用分期缴费的长期人寿保险。缴费期与保险期限相等,即要在整个保险期限内分期缴费,直至保险满期或被保险人死亡才终止缴费。分期缴费的长期人寿保险,多采用全期缴保险费方式。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条