1.
Analysis of Time-cost-quality Trade-off in Engineering Project Management;
工程项目管理中工期-费用-质量的权衡分析
2.
Research on Application of Time-Cost Optimization in Manufacturing Project of Port Machinery
工期-费用优化在港机制造项目中的应用研究
3.
Analogy system for controlling quality time cost of construction projects
工程项目质量工期费用控制模拟系统
4.
Time-cost Optimization and Its Ant Colony Algorithm in Network Plan;
网络计划工期费用优化及其蚁群算法
5.
The Study of Time and Cost Claims Based on FIDIC Contract Conditions;
FIDIC合同条件下的工期及费用索赔研究
6.
Study on the Cost Management in the Second Expansion Project of Power Plant of Tieling;
铁岭电厂二期扩建工程费用管理研究
7.
Cost Control in Huanghua Port Phase I Project;
关于黄骅港一期工程费用控制的体会
8.
shall pay for the latter's medical fees, nursing charges during treatment period and loss of income due to absence from work, and also -
应当支付医疗费、治疗期间的护理费、因误工减少的收入等费用,
9.
Short time limit, less expense and conveniet operation are its feature.
它的特点是工期短,费用少,施工操作简便。
10.
On Claim Damages and Duration Calculation within The New Edition of Conditions of Contract for Construction;
新版《施工合同条件》中费用和工期索赔的计算
11.
Expense Claim for Construction Delay of International Water Conservancy Project;
关于国际水利工程工期延误的费用索赔浅析
12.
Period of Construction Cost Optimization Model and Algorithm Design About Project Progress Adjustment;
工程进度调整的工期—费用优化模型及算法设计
13.
The Application of the CE Method in Analyzing Project LCC;
费用效率法在工程寿命周期成本分析中的应用
14.
On application of full life-span cycle cost theory in architectural projects
全寿命周期费用理论在建设工程中的应用
15.
We agree to pay for the equipment and technology by installments with the processing fees payable to us.
我方同意分期用我们应得的加工费偿付设备和技术的费用。
16.
Duration/Cost Trade-offs in Project Scheduling with Time-Switch Constraints under Multi-Cost
多种费用下具有时间转换约束的工期费用均衡项目调度研究
17.
A Case of Claim on Construction Time-Limit & Expenses of Beijie Sluice Reinforcement Project;
江门北街水闸加固一期工程工期及费用索赔实例
18.
Optimization of Expected Utility from Terminal Wealth and Consumption with Transaction Costs and Wages
带交易费及工资的终端资产和消费期望效用最优化