1) tensioning procedure
施拉程序
2) construction procedure
施工程序
1.
Foundation pit excavation and anchoring construction procedure of shiplock s vertical wall;
船闸直立墙基坑开挖与锚固施工程序
2.
Design of construction procedure and high slope support on left-bank of Longtan Hydropower Station;
龙滩水电站左岸高边坡支护与施工程序设计
3.
Based on the practice of restruction and construction of the old and new bituminous roads, this article deals with the basic characteristics of the lime, slag roadbed, and the general formation of the roadbed, meanwhile, the author expounds some key points and the construction procedures which offer some references to the road construction technicians and administration personal.
根据沥青路改建和新建工程实践,介绍了石灰炉渣及其基层的基本特性和一般组成,说明了其施工程序与要点,可供道路施工技术与管理人员参考。
3) construction program
施工程序
1.
On determination of construction program of coking project;
浅谈焦化工程建设施工程序的确定
2.
River water flow control and construction program planning of concrete-face rock fill dam for TSQ-ⅠHydropower Project;
天生桥一级水电站河道水流控制与面板堆石坝施工程序规划
3.
In this paper,the construction program,kernel and notice proceeding are expatiated based on the characteristics of residential system of shearing force wall of heat preservation.
本文根据保温模块剪力墙住宅体系的特点,设计了保温模块剪力墙住宅体系的施工程序,并对各个施工环节的施工要点和施工注意事项进行了阐述。
4) construction process
施工程序
1.
Through the analysis of damage of old arch bridges, a new way--reinforcement with arch surround is provided and discussed its construction process.
通过对该桥主要病害的分析,提出了套拱加固法的维修方案,并对该方案的施工程序及方法进行了论述。
2.
In this paper, the technique for construction of the main bridge pier was presented in detail, which consists of the construction process, technological requirements, main construction parameters and amendment on defects.
本文比较详细地介绍了泉州刺桐大桥主桥墩桩基和承台施工技术 ,包括施工程序、施工工艺、施工主要技术参数选取、事故处理等。
6) construction procedures
施工程序
1.
Importance of construction procedures in estuary regulation works
河口整治工程中施工程序的重要性
2.
This paper describes excavation in layers and zones,general construction procedures of large-sized underground powerhouse caverns at Pubugou hydropower station and excavation situations among these caverns,especially measures of changing excavation construction procedure taken for the purpose of power generation half year ahead of time.
详细介绍了瀑布沟水电站大规模地下厂房洞室群的开挖分层、分区及总体施工程序以及各洞室相互之间的开挖关系。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条