说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 抗拉载重
1)  tensile load
抗拉载重
2)  Tensile load
抗拉载荷
3)  anti-stretching load
抗拉荷载
1.
Design of steel anti-stretching load acquisition device with CAN bus;
基于CAN总线的钢筋抗拉荷载采集器设计
2.
In this paper,load value of hydraulic pressure testing machine was acquired by using photoelectric encoder and AT89C52 microcontroller,and steel anti-stretching load was discriminated by means of analyzing the time-load curve.
利用光电编码器和AT89C52相结合采集液压试验机的荷载值,通过实时分析时间荷载曲线来判别钢筋的抗拉荷载,并利用SJA1000控制器将试验结果上传至CAN总线数据服务器。
4)  Tensile strength
抗拉承载力
1.
In this paper,three group of tests including overlapped jointing,jointing with or without full welding line in the bent arc for 25Ⅱ jointing reinforcement bars were carried out to evaluate the tensile strength of the 25Ⅱ jointing reinforcement bars,according to the data acquired.
完成了包括2 5Ⅱ级钢筋搭接焊、弯折 90°对焊焊缝不填满弯折圆弧处 ,以及弯折 90°对焊焊缝填满弯折圆弧处三种情形对应的三组结构抗拉承载力试验 ,试验数据表明 ,2 5Ⅱ级钢筋搭接焊、弯折 90°对焊焊缝填满弯折圆弧处不会降低2 5Ⅱ级钢筋焊接结构的抗拉承载力 ,弯折 90°对焊焊缝不填满弯折圆弧处将使2 5Ⅱ级钢筋焊接结构抗拉承载力大大降低 ,本文基于大型结构分析软件ANSYS的非线性有限元分析结果亦验证了如上结论。
5)  axial tension strength
轴心抗拉承载力
6)  ultimate tension capacity
抗拉极限承载力
补充资料:拉普拉塔人民抗英斗争
拉普拉塔人民抗英斗争
River La Plata Region People's Fight of Resistance againet Britain 

   1806年和1807年阿根廷拉普拉塔地区人民两次抗击英国军队入侵的事件。1806年6月,英国海军上将H.波帕姆率舰队驶抵拉普拉塔河口。6月25日,英国海军陆战队1000多人在布宜诺斯艾利斯附近的基尔梅斯登陆。西班牙殖民总督索夫雷蒙特逃往内地6月27日,布宜诺斯艾利斯城陷落。英军宣布被占领地区归属英国,西班牙殖民官吏纷纷表示效忠英国国王。当地居民为保卫家园,自发组织起来进行抗英斗争。抗英部队主要有当地土生白人爱国者J.M.de普埃雷东组织的志愿队伍,以及在西班牙军中服役的法国军官S.A.M.de利涅尔斯从蒙得维的亚争取到的一支军队。8月11日,利涅尔斯指挥部队与英军开战,得到当地居民大力支援。翌日,英军战败投降。8月14日,布宜诺斯艾利斯市政议会在人民群众压力下通过决议,迫使总督索夫雷蒙特把军权交给利涅尔斯。
   1807年2月,英军从拉普拉塔河口第二次入侵,2月3日攻陷蒙得维的亚。6月28日,由怀特洛克指挥的英国海军陆战队1.2万多人在拉普拉塔河南岸登陆。当地军民虽经奋战,未能阻止英军推进。7月6日,英军对布宜诺斯艾利斯城发动总攻。利涅尔斯率军与英军展开激战,全城居民投入战斗。英军伤亡近千人,约2000人被俘,7月7日签署投降书。后西班牙国王任命利涅尔斯为临时总督。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条