说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 最终索赔
1)  final claim
最终索赔
2)  optimal claim strategy
最优索赔策略
1.
For clause C,claim size is considered in its BMS,so the existing optimal claim strategy model is not suitable for clause C.
在大多数国家,汽车保险中使用的无索赔奖励系统(BMS)只考虑了索赔次数,而我国2006年7月开始实施的A、B、C三个车险条款中的C条款是与索赔额有关的BMS,所以需要对现有的最优索赔策略模型进行推广。
3)  claim [英][kleɪm]  [美][klem]
索赔
1.
Reflection on claims from engineering alteration;
对工程变更进行索赔的思考
2.
Discuss on the question that how to carry out claims in construction work of hydraulic tunnel;
水工隧洞施工如何进行索赔
4)  claim for compensation
索赔
1.
On the claim for compensation in highway construction engineering;
关于公路施工工程中的索赔问题
2.
Based on the claim for compensation of the bobbin yarn and the total amount of the compensation from some enterpriese,introduction is done to the application of the histogram in the statistic analysis.
以某纺织企业筒子售纱索赔原因与索赔金额统计分析为例,介绍了直方图在统计分析中的应用,指出直方图分析法是很有效的管理方法,而在系统分析中要运用好直方图,必须以大量的统计资料为基础,将直方图与相关分析相结合才能有效地控制产品质量。
3.
Project alteration and the claim for compensation are major questions in the risk management in project construction.
工程变更与索赔,是在工程实施阶段的风险管理工作中的重要内容。
5)  claims [英][kleim]  [美][klem]
索赔
1.
Discussion on cost control and construction claims for constructing enterprises;
浅谈施工企业项目成本控制与施工索赔
2.
Changes and claims in construction;
工程施工中的变更与索赔
3.
On the way to increase claims consciousness of construction enterprise;
浅谈建筑施工企业如何提高索赔意识
6)  counterclaim [英]['kaʊntəkleɪm]  [美]['kauntɚ'klem]
索赔
1.
The paper introduced five kinds of project general contract applied widely in the word and management of contract and counterclaim of general contract project of cement industry.
介绍了目前国际上广为采用的5种工程总承包方式以及水泥工业建设项目总包工程合同管理和索赔管理的内容与要求;分析了设计单位进行工程总承包的优势所在;探讨了工程总包实施中各类风险。
2.
Because of many uncertainty factors and many counterclaim cases, the supervision engineer must comply with the principle based on law and according to contract s rules and facts, analyze and deal with the counterclaim cases impersonally.
随着我国加入WTO和市场经济的不断完善,施工监理的合同管理将更加符合FIDIC条款与国际惯例接轨,由于施工阶段的不确定因素多,索赔发生较多,监理工程师要遵循以法律为基础、以合同为准则、以事实为依据的原则,对索赔事件进行客观的分析和处理。
3.
It shows actual manifold quoted price mode and counterclaim convention sufficiently,describes the method and skill of quoted price mode and counterclaim in detail,and gives answering measures respectively.
对现行的多种报价模式和索赔惯例进行了充分地展示,详尽地论述了报价与索赔的方法与技巧,针对这两大策略分别提出了各自的应对措施。
补充资料:占优策略均衡
占优策略:
无论其他参与者采取什么策略,某参与者的唯一的最优策略就是他的占优策略。

占优策略均衡:
由博弈中的所有参与者的占优策略组合所构成的均衡就是占优策略均衡。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条