1) advance earthworks
前期土方工程
2) advance earthwork
前期土方工程;预造土方工程
3) prophase construction
前期工程
1.
Quality management of prophase construction of Laxiwa Project--Discuss on management under the new structure of construction teams;
拉西瓦前期工程施工质量管理——由水电施工队伍的结构变化对新形势下管理的初探
4) earth work
土方工程
1.
Mechanization of earth work construction machinery;
土方工程机械化施工管理
2.
This article expressed the requirement,the test objects,the test standard,and the test method of the fill materials for the earth work,and show the differences from China.
从试验的角度着重阐述了国外土方工程对填料的要求和试验检测项目以及试验所采用的试验标准和试验方法,并简单介绍了该方法与国内公路工程试验相关标准和方法的不同之处,对国外试验工作具有参考和借鉴意义。
5) earthwork
[英]['ɜ:θwɜ:k] [美]['ɝθ'wɝk]
土方工程
1.
On earthwork construction in deep foundation pit of high-rise building;
浅谈高层深基坑土方工程施工
2.
This paper expounds the influence of the construction organization plan on the cost estimation of the earthwork from aspects of the construction organization investigation, construction methods, construction machines and tools selection, and rearrangement of earthwork and stonework, etc.
从施工组织调查、施工方法、施工机具选择、土石方调配等方面阐述了施工组织设计对路基土方工程成本的影响,对今后路基工程施工组织设计的编制和成本管理具有一定的指导作用。
3.
Especially, in respect of concrete work, reinforcement project and earthwork detailed construction technologies are introduced and application effects are analyzed in the end.
以大同煤炭集团冬期钢筋混凝土工程施工为例 ,阐述了冬期钢筋混凝土的施工原则 ,详细介绍了冬期混凝土工程、钢筋工程、土方工程的施工技术 ,并提出了具体应用效
6) preliminary engineering cost
前期工程费
补充资料:前期工程
前期工程
[前期工程]房屋建筑工程施工开工以前的一切准备工作,也包括拆迁。因为拆迁工作很复杂,政策性很强,一般把拆迁工作除外,所有开工以前的工作叫前期工程。一般称为“三通一平”,也有称为“七通一平”的。征用土地在红线内拆除地上物后,还应对地下进行调查、了解。对地下文物、古墓、管道、电缆、防空洞和其他地下物等,要按各有关规定进行地下物的清除。如不能清除的也要在设计时考虑采取处理措施。场地拆清后,按规划设计的标高进行场地平整,并按设计要求将上水、污水、雨水、电缆、暖气、煤气、通讯电缆和道路等铺设到红线或红线以内。自来水、污水、雨水、电、暖、煤气、通讯等在规划设计时应征得当地有关部门的意见,商量妥当,并要求这些部门签字认可,签订好合同后,再正式出图。施工单位按照施工程序,按图施工。对于高层建筑来说,地基部分的建筑物埋置较深,所以在前期工程中更要合理安排。“三通一平”或“七通一平”完成后,土地开发才算完成。