1)  tensile test
拉力测试
2)  test of prestress
预拉力测试
3)  pull testing system
拉力测试系统
1.
Design of control software in pull testing system;
拉力测试系统的软件设计
4)  suspender pulling force test
吊杆拉力测试
5)  standing pull trial
系泊拉力测试
6)  tension
拉力
1.
Calculation of tension acting on arbor in process of extruding aluminium alloy tube without lubrication;
铝合金管材无润滑挤压穿孔针拉力的计算
2.
Analysis of tension and displacement of geomembranes placed on landfill slopes;
垃圾填埋场边坡上土工膜的拉力与位移分析
3.
Study on Newton Iteration Method of Sketch and Tension of Suspension Rope;
牛顿迭代法悬索线形与拉力的研究
7)  Pulling force
拉力
1.
Relationship between pulling force and major chemical components in flue-cured tobacco leaves;
烤烟拉力与主要化学成分的关系研究
2.
The extrusion length is mainly determined by arbor strength when aluminium alloy tube is extruded without lubrication based on the calculation of arbor′s pulling force.
根据对穿孔针所受拉力的计算 ,得出如何确定无润滑挤压铝合金管材时合理的铸锭长度 ,以减少挤压时的断针现象。
3.
The conclusion is obtained from the analysis and calculation on the forces encountered by the recoiling partition of guns during recoiling action that the pulling force produced by artificial recoiling oil cylinder can meet the requirement when the recuperator supplies the air at 8.
5MPa时,人工后坐油缸拉力能满足使用要求的结论。
8)  pull
拉力
1.
According to the question texted such as awl head does deeline, one is drawn press the experiment in the pole and very beginning spiral shell of awl hole and concentric pull text of an axes of pole .
包括锥头偏斜杆件拉、压试验;锥头螺孔与杆件轴线不同心拉力试验等。
2.
The cement-mixed pile in composite soil nailing wall is helpful for the reductions of the horizontal deformation of deep excavation and the pull of soil nail.
结果表明,设置不同排数的搅拌桩对于复合土钉墙的受力机理、变形特性、土钉拉力大小及分布均有较大影响,1~2排搅拌桩较为合理,过多的搅拌桩排数可能会导致复合土钉墙出现重力式挡墙的受力、变形性态,增加上部土钉的拉力。
3.
In rectilinear motion,the extremum of pull(F)varies with the factor;angleθ=α=arctgμ(μ:friction factor;angleθ:the angle between the direction of pull and the motion direction).
在直线运动中拉力F的极值随摩擦系数 μ的变化而变化 ,当θ=α=arctgμ( μ为摩擦系数 ,θ角为拉力F和运动方向的夹角 )时 ,F有极小
9)  tensile force
拉力
1.
It has close relation between broken pulling force of wire rope and tensile force value dispersed degree of steel wire for rope.
对国内 3家工厂和日本产 72A盘条进行试验并分析 ,钢丝绳的整绳破断拉力值和制绳钢丝拉力值的离散度有密切关系。
2.
According to feature of reinforced earth structures and experimental results, the authors apply mathematical statistics method to analyze physical and mechanic parameters of filling materials gravity(γ) and reinforced materials tensile force, and results show reasonability by engineering examples checking.
笔者针对加筋土结构本身的特点,结合试验结果,采用数理统计的方法,对加筋土填料(主要为砂卵石填料)的重度γ、加筋材料的拉力进行统计分析,并将其应用于工程可靠度验算,其结果表明是合理的,可为加筋土结构设计规范修订提供一定的参考。
10)  stretching force
拉力
补充资料:测试结果可接受性的检查和最终测试结果的确定


测试结果可接受性的检查和最终测试结果的确定
check of the acceptability of test results and determination of the final test result

  C凡(3)二3.3d,时,取此3个结果的平均值作为最终侧试结果;否则取它们的中位数作为最终测试结果。。,为重复性标准差(即在重复性条件下所得侧试结果的标准差)。 在口田T 11792一1989中还对重复性和再现性条件下所得侧试结果可接受性的检查方法和最终测试结果的确定做了详细讨论和规定。(马毅林)ceshi 11叩uo kejieshCxjxing d6 iiancha he zuizhong ceshi】i闪旧de que心ing测试结果可接受性的检查和最终测试结果的确定(checkof山eac,ptability of test,ults助ddsterminationofthefi耐testresult)在商品检验中进行一次测试的情形不多见,当得到一个测试结果时,所得结果不可能直接与给定的重复性标准差作可接受性的检查。对测试结果的准确性有任何疑问时都应再进行一次测试。所以,对两个测试结果进行可接受性的检查是一般的情况。 可接受性的检查,实际上是一种统计检验。任何两个测试结果只要能通过可接受性的统计检验即可认为是一致的,均可接受。比如,在重复性条件下,所得结果之差的绝对值(下称绝对差)不超过相应的重复性限r(见重复性和再现性)的值,则认为两个结果是一致的,均可接受;如果两个侧试结果的绝对差超过r,则认为它们是不一致的,必须增加测试。 按国家标准《测试方法的精密度在重复性或再现性条件下所得测试结果可接受性的检查和最终测试结果的确定》(GBIT 1 1792一1989),在重复性条件下,如果两个测试结果的绝对差不超过r的值,可取两个侧试结果的平均值作为最终测试结果。如果两个结果的绝对差超过r的值,并且测试费用较低,须再做两次测试。当4个结果的极差(即其中的最大值与最小值之差)不超过相应的临界极差c,瓜(4)二3.6a,时,取4个结果的平均值作为最终测试结果。如果两个结果的绝对差超过r的值,并且测试费用较高时,只须再作一次测试。当3个结果的极差不超过相应的临界极差
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条