说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 土芯检视
1)  inspection core test
土芯检视
2)  filter element access cover
滤清器滤芯检视盖
3)  core [英][kɔ:(r)]  [美][kɔr]
土芯;岩芯
4)  core [英][kɔ:(r)]  [美][kɔr]
土芯;芯样
5)  soil core
土芯
1.
Research on soil core plugging up of open-end stell pipe pile in Bao-Stell Area;
宝钢地区钢管桩土芯闭塞性状研究
2.
The reason for the appearance of internal friction in tubular piles is that the relative displacement or its trend exists between the soil core and piles.
筒桩与土芯存在相对位移趋势以及它们之间相对位移的发生是筒桩内侧摩阻力产生的原因。
3.
Owing to the complexity of soil core character,the calculation of bearing capacity of tubular pile isn′t mature and the operation mechanism of single pile bearing capacity is not clear yet.
筒桩土芯性状复杂,土芯对单桩竖向承载力作用机理尚不明确,当前筒桩承载力计算还不成熟。
6)  visual protein chip
可视化抗体检测蛋白芯片
1.
Objective:The visual protein chip was prepared for tubercle bacillus(TB) auxiliary diagnosis,in which the seven epitope-dominant antigens of Mycobacterium tuberculosis were used as detecting proteins.
目的:利用克隆表达的7种结核分枝杆菌优势表位抗原,建立可视化抗体检测蛋白芯片,用于结核病辅助诊断。
补充资料:Z8612热芯盒射芯机操作规程
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、
检查设备上行程开关和碰块的位置是否正确,如不正确,必须调整。
b、
接通电源,打开压缩空气伐门,先用手动方法,对各机构逐进行点动试车,然后用自动方法,进行一个循环试车,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、
在设备开动后,一个循环未完成时,不许中途调整电器,以免发生误动作,造成设备人身事故;
b、
设备的每一个循环后,必须用喷咀清除芯盒上残存的砂子,并喷涂分型剂;
c、
在未切断电源和所气源前,不准将手伸入芯盒和夹紧器之间的空隙处,或把手放在导轨上,以免发生人身事故。
d、 一般不准空射,如必须空射,一定要把压缩空气伐门关小;
e、 如果用手操作,不准同时操作两个电器开关。
4、工作后还必须遵守:
a、
操纵各个电器开关,使设备各机构恢复到原始位置,然后切断电源和气源;
b、 折下射砂头,清理积砂和粘砂;
c、 清除排气塞内的粘砂;
d、
取下射砂筒,清除缝隙中的粘砂,最后用石蜡涂擦内壁,但不要将缝隙堵塞;
e、 清除闸板上的积砂,并在闸板上涂石墨粉,以减少磨擦;
f、 清除导轨和导杆上的积灰和积砂,并涂上一层润滑油。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条