1) standard time of obsevation
标准观测时间
2) spatial standard observer
空间标准观测仪
3) standard time
标准时间
1.
In virtual manufacturing environment, MOD method is applied to complete work measurement and obtain standard time, which breaks through the traditional areas of application in realistic manufacturing system.
在虚拟制造环境下,应用模特法对制造系统进行作业测定,制定标准时间,突破了模特法一般应用在现实制造系统进行作业测定的传统应用范围,进而为虚拟制造系统优化设施布局、编制生产计划、确定劳动力需求计划提供了方法和依据,避免了生产系统投产后调整布局及人员配置等所花费的人力和物力。
2.
This paper discusses the content and effect of work measurement(WM)technology,points out the existing problems when WM technology is employed to shape standard time.
论述了作业测定技术的作用及内容,指出了企业应用作业测定技术制定标准时间过程中存在的问题,并深入分析问题产生原因,最后结合作业测定理论及实践经验,提出改进建议。
3.
To track the standard time and the resources which including the labor and machin- ery of the main activities in high-rise housing so that it could be used to analyze the construction schedule, the development of this study is based on work-time.
为了掌握高层住宅施工中各主要工序所需的标准时间及资源(人力和机械),从而为分析不同施工方案创造条件。
4) time standard
时间标准
1.
Value appraisal scale of file,which should be held in ckecking operation,was discussed from aspects of pragmatic value,perservation expenses and time standard etc.
文章针对档案鉴定工作中存在的问题 ,从档案利用价值和保存代价及时间标准等方面 ,论述了档案价值鉴定工作应准确把握尺度的观
2.
A guarantee system for unified time standard and qualified time service technique is essential for an independent country.
国家必须有统一的时间标准和时间服务技术质量保障体系。
5) time criterion
时间标准
1.
On the basis of analyzing the legal obligation of reasonable dispatch to be undertaken by the carrier of marine goods, this article suggests that the reasonable time shall be regarded as a time criterion of defining delay in delivery under Maritime Code of PRC in absence of agreement about the time of cargo delivery under the contract of carriage.
在分析海上货物运输承运人具有合理速遣的法定义务的基础上,主张在运输合同没有约定货物交付时间的情况下,“合理时间”应作为我国《海商法》确定迟延交付的时间标准。
6) observation time
观测时间
1.
Selection on degasification temperature and observation time of radon observation sample;
水氡观测样品脱气温度及观测时间的选取
2.
To solve the contradiction between target tracking accuracy and observation interval,an algorithm of calculating observation time based on target estimate covariance control was presented.
为解决目标跟踪精度与观测时间间隔的矛盾,提出了一种基于目标状态估计协方差控制的观测时间确定算法。
补充资料:德国国家标准(见德国标准化学会、德国标准体系)
德国国家标准(见德国标准化学会、德国标准体系)
National Standards of Germany: see Deutsches Institut für Normung, DIN;standards system of Germany
Oeguo Guol心日icozhun德国国家标准(Natio.吐S加Ln山切曲of Gen”旧ny)见德国标准化学会;德国标准体系。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条