说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 可靠度指数,可靠性指标;可靠指标
1)  reliability index
可靠度指数,可靠性指标;可靠指标
2)  reliability index
可靠指标
1.
Ant colony optimization algorithm and its application to calculation of structural reliability index;
蚁群优化算法及其在可靠指标计算中的应用
2.
Linear feasible direction algorithm for calculation of reliability index of structure;
求解结构可靠指标的线性可行方向算法
3.
Improved moment method for reliability index without explicit performance function;
具有隐式功能函数的结构可靠指标计算的改进矩法
3)  reliability [英][ri,laiə'biliti]  [美][rɪ,laɪə'bɪlətɪ]
可靠指标
1.
The endurance life and corresponding index of reliability of the reinforced concrete structure are calculated by the theory of reliability.
运用可靠度的原理,计算了结构的耐久年限及对应的可靠指标,分析了影响钢筋混凝土结构耐久性的主要因素。
2.
Considering the spatial correlation of soil properties, using calibration method,the reliability index of axially loaded pile bearing capacity desinged from the available CPT formulae is ealculated.
通过对比47根钻孔桩静力触探和静载荷试验资料,对钻孔桩承载力的无量纲随机变量试计比λp作了统计分析,检验了其分布特性,考虑了土性的空间自相关性,并用核准法对现有静力触探公式设计的轴力桩的可靠指标进行了计算。
3.
Analysis of Influence of Concrete Strength Average Value and Variation Coefficient on Dam Reliability;
本文以 Hsiegh- Ting- Chen四参数模型作为混凝土的破坏模型 ,建立了可用于重力坝可靠度计算的极限状态方程 ,在此基础上探讨了重力坝筑坝材料强度均值与变异系数对可靠指标的影响 ,并对这二者进行了对比分析。
4)  index of reliability
可靠指标
1.
The index of reliability of the single bored pile is calculated with both JC method and Monte Carlo method.
采用了JC法和Monte Carlo法两种方法进行可靠指标的计算,并对影响可靠指标的各种因素进行了分析。
2.
The index of reliability of deep-mixing piles is calculated with JC method,and the influence of the reliability index with the alteration of load effect specific ρ is analyzed,get the conclusion that the reliability index β increases with ρ.
结合新乡地区深层搅拌桩复合地基静载荷试验数据,采用无量纲随机变量的极限状态方程进行了可靠度分析,采用JC法对其进行了可靠指标的计算,并分析了不同荷载效应比ρ对可靠度指标的影响,得出可靠度指标β随ρ的增大而增大的结论。
5)  Reliability index
可靠度指标
1.
Relationship between safety factor and reliability index of retaining wall s stability;
挡土墙稳定性安全系数与可靠度指标的关系
2.
The sensitivity of the reliability index to the variance of load and soil properties are analyzed.
阐明了各个设计参数的重要程度及其变化对分项系数及可靠度指标的影响规律,并将分折结果与API规范中规定的分项系数进行比较,从而证明其对渤海油田桩基础设计的适用性。
3.
It is difficult to define the value of comprehensive variability coefficient of resisting force and acting force in reliability index inspection.
抗力和作用力的综合变异系数的取值是规范套改中可靠度指标检验中的难题。
6)  index of reliability
可靠度指标
1.
In this paper,the author use the method of mapping transformation to calculate the index of reliability β for the safe coefficient K=2 at the probable ratio of variable load and permanent load in practice of construction,and giving the relation function of ρ,β.
以山东淄博某烟囱项目为例,运用映射变换法计算出在安全系数K=2时,工程实践中可能出现的活荷载、恒荷载标准值比值ρ下的单桩可靠度指标β,并给出了ρ,β关系函数,检验了在何种情况下能达到所规定的目标可靠度。
2.
Introducing the probability modeling of soil profile base on the stochastic field theory,structural theory is used to analyze index of reliability of the foundation stability by means of engineering projects.
在地基稳定的可靠性分析中,引进基于随机场理论的土层概率模型,运用结构可靠性设计理论,同时结合工程例对地基稳定的可靠度指标进行了分析。
3.
Further research is also carried out on sensitivity of parameters of shear strength c,φ and relationship between index of reliability and safety factor.
φ随机变量的敏感性以及可靠度指标和安全系数之间的关系作了进一步的探讨。
补充资料:发电系统可靠性指标


发电系统可靠性指标
generating system reli-ability indices

概率。由于所有矩形面积之和即所求石ENS,故有 csEENs(lh)一艺p(X),MW·h(5)X一况+1 当容t模型中的功率步长△X不等于1,且负荷L的值并不恰好使R~Cs一L对应某一停运容量时,则式(5)应修正为 几 ::、s(lh)一战[艺尸(x)一。〕,Mw·h(6)式中二为研究期间天数.ci和L,分别为第j天的系统可用发电容t和日峰荷.Li.,为第j夭第k小时的负荷.尸,(·)和F,(·)分别为爪积概率和尽积颇率。 式(8)求得的系统故障频率是以天数为基础表示的,即表明出现系统故障的天数而不是故障的次数.因此,与日负荷曲线的形状(例如单峰或双峰曲线)无关。 这种情况下的系统故津持续时间指标用下式计算D、(期间)HLOLE(期间) X一况+1式中。=(R/△叉一N)P〔(N+1)△义〕,N=(R/△欠)取整。对于大型系统或△叉不大时,误差。的影响可以忽略。当研究的是某一期间(周、月或年)的指标时,由式(6)可得(略去。) 凡(期间)代人上式,得,h/次将式(3)和式(8)D。(期间)万万p,(C,一L,·‘)客[pJ(c,一“J)+六客F,‘c,一“J,·,〕,h/次 2一cz~(期间,一“艺万〔艺凡(X)〕,,一IK·lx·几一乙,**MW·式中,为研究期间的天数;电容t。h/期间(7) C为第]天的系统可用发 (9) 应用两级日负荷模型(见发电系统可金性负待模型)计算系统故障频率时,假定日最高负荷L持续时间为t,并忽略最低负荷L。时发生系统故障的可能性(相当于令L。一0),则式(8)可简化为┌─┐ │团│ ├─┼─┐ │环│不│ ├─┼─┘ │忍│ ├─┼──┬───┐ │霎│潍 │洪曰一│ │ ├──┤刁卜~ ├─┐│ │撇 │ JJ_ │萎│├─┤ ├───┤ ││曰│ │厂] │ │└─┴──┴───┴─┘F·‘期间,一客[p,‘C,一L,,+轰F,‘C,一L,,」, 次/期间(10)式中n为研究期间天数;c,和乌分别为第j天的系统可用发电容量和日最高负荷;t,为第j天日最高负荷的持续时间。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条