您的位置:首页 -> 词典 -> 削峰,调峰
1)  peak clipping
削峰,调峰
2)  Peak clipping
削峰
3)  peak-shaving
调峰
1.
Application of LNG in peak-shaving of city gas pipeline network
LNG在苏州城市管网供气调峰中的应用
2.
According to the present pipeline condition, the paper proposed some peak-shaving techniques, like the tail .
针对西气东输天然气管道供气用户多、用户类型不同、供气量峰谷变化大等造成管线运行不平稳的突出矛盾,分析了城市用户、工业用户、电厂用户等不同类型用户的用气峰谷变化规律及对管道平稳运行的影响;根据管道现有条件,提出了利用管段末端储气解决日调峰、全线储气解决周调峰、气田调控和储气库解决季节调峰等调峰技术措施,并对联络线调峰方式进行了探讨;同时针对现有储气库设计,提出改进储气库调峰功能的技术建议,尤其要从设备选型上满足储气库解决各类调峰问题的能力。
3.
In order to recover the pressure energy generated in the natural gas pipeline networks and to meet the demand of urban natural gas peak-shaving, LNG peak-shaving proposal was advanced to recover pressure energy of gas transmission pipeline networks.
为了回收天然气管网蕴含的巨大压力能,且同时满足城市燃气调峰的需要,提出了回收输气管网压力能的天然气液化调峰方案。
4)  peak shaving
调峰
1.
One of the major applications of a simulation software for gas pipeline operation is peak shaving of gas supply system.
供气调峰过程是输气管道运行仿真软件的主要应用对象之一。
2.
Based on the West-to-East Gas Pipeline's operation in 2008,the research on short-term peak shaving is carried out.
利用输气管道模拟软件(TGNET)研究了2008年西气东输管道的短期调峰问题。
3.
Through comparing the characteristic of different gas storage facilities, the paper proves that the construction of underground natural gas storage is the most effective action to solve the problem of peak shaving and ensure uninterrupted gas supply fundamentality.
对各种储气调峰设施的特点进行了比较 ,结合我国天然气管道工程 ,根据计算结果 ,说明建设地下储气库是从根本上解决调峰和保证不间断供气的最有效措施。
5)  peak regulation
调峰
1.
With the fast increasing of power desire in Guangxi province and the enlarging of the load peak and off-peak difference,system needs peak regulation capacity urgently.
随着广西电网电力需求迅速增长,负荷峰谷差日益扩大,系统迫切需要调峰容量。
2.
The main problems of peak regulation in northeast power gird were analyzed.
分析东北电网目前调峰存在的主要问题。
3.
Taking the peak regulation of hydropower systems into account, a long-term optimization model of the maximum peak regulation expectation for the Jinshajiang cascade hydropower stations is set up.
以金沙江干流梯级水电站水库群为研究对象,建立了金沙江梯级水电站水库群兼顾保证出力要求的以发电量最大为目标的长期优化调度模型;考虑水电系统的调峰要求,建立了金沙江梯级发电量最大长期优化调度模型。
6)  peak-load regulation
调峰
1.
From aspects of the capability demand for peak-load regulation of Shaanxi Power Grid,governing the Yellow River and Weihe River,governmental targets of energy,conservation and waste reduction,the economic development of Shaanxi,the suggestions to build Qikou,Guxian and Ganzepo cascade hydropower stations are proposed.
从提高陕西电网水电调峰能力的需求出发,从治理黄河、渭河的角度出发,从政府的节能减排目标出发,从陕西经济的发展出发,提出了加快建设碛口、古贤、甘泽坡3个梯级水电站的建议。
2.
Due to the tendency that large-scale nuclear power plants plays an increasing important role in grids of China,the condition of large-scale pressurized water reactors(PWRs)participating in peak-load regulation of grid is reviewed.
针对未来我国大型核电装机比重在区域电网日益增长的趋势,介绍了我国与国外大容量压水堆核电机组参与电网调峰的现状,分析了它们参与中间负荷调峰的必要性;通过分析商用压水堆设计特性、核汽轮机工作特性指出了机组进行日中间负荷调峰的可行性,推荐了日负荷跟踪出力曲线;指出压水堆在局部功率峰、慢速调节硼酸浓度、氙钐等毒物的瞬态、堆芯寿期末的碘坑、燃料芯块与包壳的相互作用等方面,制约着机组调峰的安全性和灵活性,在此基础上深入探讨机组适应日负荷跟踪调峰运行需具备的技术条件;以大亚湾M310型机组为例,通过分析其负荷变动时稳态和瞬态下主系统和设备的工况变化,指出调峰运行对电站核安全、可靠性的负面影响有限,对经济性的降低较明显;以第三代先进压水堆为例,提出了机组适应调峰运行需努力的技术方向。
3.
The main purposes of developing PSPS is to solve the issues of peak-load regulation and eco-nomical operation of power system.
本文对抽水蓄能电站在电网中的作用和效益进行了分析,认为当前发展抽水蓄能电站主要是解决电网调峰和经济运行的问题,而经济运行问题逐步成为决定的主要因数,建设抽水蓄能电站取得的经济效益如何合理分配,是发展抽水蓄能电站的关键。
补充资料:调峰运行


调峰运行
peak and cyclic load operation

  低负荷运行时要加强对机组振动、胀差、排汽缸温度的’监视。对于采用低负荷运行调峰方式的汽轮机主要考虑的问题是低负荷运行热效率降低和频繁快速增减负荷引起汽缸、转子低周疲劳损伤.汽轮机变压运行,各级燕汽温度随负荷变化很小,同样的低周疲劳损伤指标,可允许有较快的增减负荷速度。另外对于配有变速给水泵的机组,在低负荷运行时具有较好的净热效率,通常与定压运行比较,运行效率可改善2%~3%。因此带中间负荷的调峰机组都设计成变压运行方式,目前采用较广的一种称为定一滑一定复合变压运行方式(见变压运行),这种负荷调节方式,在整个负荷范围,保持了较高的运行效率和较好的负荷适应性。 有些母管制中小机组,在夜间负荷低谷时,采用少燕汽无负荷运行方式。这时机组仍并于电网,汽轮机通人少量蒸汽进行冷却,发电机转为电动机方式运行,带无功负荷,故也称为调相运行。而当负荷升高时机组能很快转为正常运行方式,接带负荷。 周末停运电网负荷一般在周末时比较低,为此要求机组周末停运,周一起动。这类机组应具有较好的起动特性和较高的运行经济性。 存在问题电网中有些大型火电机组,过去是按承担基本负荷设计的,主要采用喷嘴调节定压运行,负荷适应性较差,加上锅炉燃煤煤种多变,旁路容t不足或不能正常使用,给降低负荷承担调峰任务带来一定困难。相当多的燃煤锅炉最低稳燃负荷仅为70叭~80%额定值,调峰能力很差。不少机组自动化程度不高,热态起动性能不好,很难实现两班制运行。为此,电网应根据地区负荷发展具体情况,研究网内机组承担调峰的运行方式、调峰幅度和进一步提高调峰能力的改造措施。除充分发挥火电机组的调峰能力外,电网还须考虑其他调峰手段,如建抽水蓄能机组,充分利用水电厂的调峰能力,增设燃气轮机组等,以求电力、电蚤和调峰的全面平衡.t一oofeng yunx旧g调峰运行(peak and eyelie load operation) 机组承担电网调峰任务的特殊运行方式。所谓调峰是指承担电网负荷曲线中最低负荷到最高负荷之间的负荷调节任务。这部分又可按平均负荷线分为尖峰负荷与中间负荷两部分。电网尖峰负荷通常应由坝库式水电机组、抽水蓄能机组、燃气轮机组、柴油发电机组和中小型火电机组承担,它们具有起停迅速,运行灵活性大等特点。专用于带尖峰负荷的机组,每年起停次数达300次以上.电网中间负荷主要由大中型容量火电机组承担,但由于电网负荷峰一谷差逐渐增大,同时又普遍缺少带尖峰负荷的机组,所以一般电网的尖峰负荷和中间负荷多要求火电机组承担。